There is no standard generator cost per kWh. A figure that does not state the load it assumed, the running hours and the diesel price behind it cannot be checked, compared or defended.
What a cost per kWh figure is actually for
Buyers usually go looking for a cost per kWh for one of three reasons: to judge whether generating power is cheaper than another source, to recover the running cost from tenants or a project budget, or to compare two generator sizes before ordering.
One figure can serve all three, but only when it travels with its assumptions. A cost per kWh is a derived number, so it inherits every assumption used to derive it. Two figures produced from different loads, different diesel prices or different running hours cannot be compared however similar they look on the page.
It also helps to be clear about what the figure is not. It is a running cost on your own site, with your own machine, at your own duty. It is not a tariff, and it does not describe what someone else would pay to generate the same unit of energy.
The cost lines that make up the figure
Four lines do the work. Each one is easy to omit, and omitting one is exactly what makes a figure look attractively low.
| Cost line | What belongs in it | What is commonly left out |
|---|---|---|
| Fuel | Litres per hour at your average load, multiplied by the diesel price you actually pay. | The difference between full load and average load, and the price movement between purchase and use. |
| Maintenance and consumables | Oil, filters, coolant, belts, battery replacement, and the labour of the scheduled service. | Consumables bought between services, and unplanned breakdown labour rather than scheduled work. |
| Capital recovery | The share of the landed cost — purchase price, freight, duty, clearing and installation — that belongs to the hours you run. | Duty, clearing, inland transport and installation, which is why the landed cost sits above the quoted price. |
| Site overheads | Fuel storage, security, plant room ventilation, foundation upkeep, and operator time where it exists. | Operator hours entirely, and the energy a plant room's ventilation or heaters consume. |
Building the figure in order
Work through the steps in sequence so each assumption stays visible and can be challenged by whoever reads the result.
| Step | What to do | What to watch for |
|---|---|---|
| Fix the operating pattern | Decide the average load factor and the running hours the figure is meant to describe. | Using the rating plate instead of the average load, which understates the cost of each kWh. |
| Price the fuel | Multiply consumption at that load by the diesel price you pay, and write the price and its date beside the result. | Publishing a figure without a dated price, which makes it impossible to review later. |
| Add the consumables reserve | Spread scheduled service parts and labour across the same running hours. | Forgetting the first service and the annual items, which both fall in the first year of ownership. |
| Recover the capital | Spread the landed cost across the running hours the set can realistically be expected to deliver. | Spreading it across an optimistic hour count, which flatters the result. |
| Divide by the energy delivered | Divide the total by the kWh the set actually produced in the same period. | Dividing by rated output rather than by delivered energy. |
Why part load raises the cost of every kWh
Two effects push in the same direction. The engine's overheads do not fall with the load, so each kWh produced at a light load carries a larger share of fuel than one produced at a heavy load. Maintenance intervals are normally counted in running hours rather than in energy delivered, so a lightly loaded set that runs for long periods reaches its service interval having produced less.
The practical outcome is that the cheapest kWh usually comes from a set that is correctly sized and reasonably well loaded, not from the largest set on the quotation. Oversizing is a running-cost decision as much as a purchase decision, which is why the quotation checklist puts the duty basis and the load next to the price rather than after it.
Comparing the same load served in different ways
A cost per kWh becomes useful when the same load is described the same way in every option. If one option assumes full load and another assumes an average, the comparison is measuring the assumption rather than the choice.
Where a generator is being weighed against grid supply, solar or a hybrid arrangement, hold three things fixed: the same total energy delivered, the same measurement period, and the same treatment of capital cost. Only then does the difference between the options mean anything.
For the units themselves, the kW, kVA and kWh page explains how delivered energy relates to rated output, and the unit guide covers the conversion and the power factor in more depth.
The same load served by an inverter or by solar
The three fixed points in the previous section are the frame. This section fills in what sits inside it, because the comparison between a generator and either an inverter or a solar system is usually attempted with the generator's cost line and the other option's purchase price, which is not a comparison of anything.
No figure is calculated on this page. Each option is written as a cost line in words, with the variables that move it and the terms that have to be fixed before two options can be put side by side. The arithmetic belongs to the site, not to the article: the fuel price, the tariff, the load and the hours are the reader's, and substituting someone else's for them is how a comparison ends up measuring the assumption.
| Option | The cost line, written out | Variables that move it | Terms to fix before comparing |
|---|---|---|---|
| Generator alone | Fuel per hour at the actual load, multiplied by the fuel price paid, plus the consumables and labour reserve spread over the same hours, plus the share of landed cost carried by those hours, all divided by the energy delivered in the same period. | How far the running load sits below the rating; the fuel price and its movement between purchase and use; whether the interval is reached by hours or by calendar time. | The average load factor, the running hours, and a dated fuel price. |
| Grid, with an inverter and a battery | Grid energy drawn, divided by the round-trip efficiency of the charging and conversion path, multiplied by the tariff paid, plus the battery bank cost divided by the energy the bank will deliver before it needs replacing, plus the inverter and balance-of-system capital divided by the energy it will pass over its service life. | Round-trip efficiency; the tariff, including whether it is banded by time of use; the depth of discharge the bank is worked to; ambient temperature, which sets calendar life independently of cycles. | The energy delivered, the measurement period, and the treatment of the battery as a consumable rather than as capital. |
| Solar, with a battery | Array and battery capital, plus inverter and mounting capital, plus inspection and cleaning labour over the period, plus battery replacement divided by lifetime throughput, all divided by the energy actually delivered. | The specific yield at the site rather than at a reference location; derating for temperature, soiling and wiring losses; the seasonal pattern, which decides how much of the year the battery is doing the work; the depth of discharge. | That the yield figure is a site figure and not a panel rating, and that the delivered energy is measured at the load rather than at the array. |
| Solar, with a battery and a generator | The solar and battery lines above, plus the generator line counted only against the energy the generator actually supplies, with the generator costed at the load it runs at rather than at its rating. | How the load is split between the sources; whether the generator runs at a reasonable load when it does run; whether the battery is sized for the night or only for a bridging period. | One shared energy total, split explicitly between sources, with each source costed at its own operating point. |
Three conventions make the comparison legible, and each one is easy to get wrong in a way that flatters one option. The first is to count delivered energy at the load in every case, because a figure taken at the array or at the battery terminals is not the same quantity as one taken at the distribution board. The second is to treat the battery as a consumable with a finite throughput, in the same way the generator's consumables are treated, rather than as capital that never comes back. The third is to keep the measurement period identical, because a solar line and a generator line spread over different periods are not comparable however carefully each one is built.
What the table does not capture is the shape of the load through the day, and that is usually what decides the outcome. A load that runs mostly in daylight suits a solar line; a load that runs through the night pushes the work onto the battery and changes which variable dominates. Nor does it capture what an interruption costs, which for some sites outweighs any difference in the cost line. Both belong in the decision, and neither is visible in a single figure per unit of energy.
The two-line comparison, with the formulas set against each other and the duty cycle treated as the deciding input, is worked through in generator versus inverter running cost. The fuel side of the generator line is covered in diesel generator fuel consumption, and the habits that keep the generator line from drifting are in the maintenance schedule.
What is worth asking a supplier for
A supplier's influence on your cost per kWh is limited but important. They control the consumption data, the maintenance scope and the landed cost, and all three can be put in writing before you commit.
| Ask for | Why it changes the running cost |
|---|---|
| Consumption at part load, not only at full load | Most sites run below full load, so a full-load figure on its own understates the fuel line. |
| The maintenance scope and its interval in writing | The consumables reserve depends on what the interval includes and how often it falls due. |
| The landed cost broken out | Duty, clearing, inland transport and installation belong in capital recovery but are often quoted separately or not at all. |
| Spare parts availability for the offered engine | Parts that must be imported extend downtime, and downtime is a cost this calculation does not contain. |
The two inputs to that figure are the fuel price and the litres consumed, covered in the Lagos diesel price and in the fuel consumption calculator.
Request the data behind a running cost calculation
Send your average load, your daily running hours and the diesel price you pay, and ask for the offered engine's part-load consumption, the maintenance scope and the landed cost in writing.
Get a written quotation
Three fields. We reply with the rating, the engine option and the delivery basis.
Cost per kWh questions
Is there a standard generator cost per kWh in Nigeria?
No. The figure depends on the load the set carries, the diesel price at the time, the maintenance scope and how the capital cost is spread. Any published figure has to state those assumptions to be usable.
Should the purchase price be included in the calculation?
Yes, as capital recovery. The landed cost — purchase price, freight, duty, clearing, inland transport and installation — is spread across the running hours the set is expected to deliver. Leaving it out describes only the fuel and flatters the result.
Why does the figure rise when the set runs at part load?
Because the engine's overheads do not fall with the load, so each kWh carries a larger share of fuel, and because maintenance intervals are usually counted in running hours rather than in energy produced.
How should the diesel price be handled?
Use the price you actually pay, and record both the price and the date beside the result. Diesel prices differ between cities and move from week to week, so an undated figure cannot be reviewed later.
Can a generator cost per kWh be compared with grid power?
Only when the same total energy, the same measurement period and the same treatment of capital cost are used on both sides. Otherwise the comparison measures the assumptions rather than the two options.
Which cost line is normally the largest?
Fuel is normally the largest continuing cost on a diesel set, followed by maintenance and consumables. Capital recovery depends on utilisation: the more hours the set runs, the smaller its share of each kWh.