How to Read a 100kVA Generator Quotation in Nigeria

Two suppliers can both quote 100kVA and still be offering different machines. This guide walks through the ten lines that decide whether two 100kVA offers are comparable, and how to ask for them in one message.

Industrial diesel generator set on a steel skid prepared for export quotation review in Nigeria
Reference photograph of a generator set prepared for export. The written quotation identifies the exact engine, alternator, controller and rating supplied.
Buyer principle

A quotation is comparable only when it describes the same scope. A 100kVA number without a power factor, a duty basis, an engine model and a delivery term is a fragment, not an offer.

What 100kVA actually delivers

A generator rated in kVA is rated in apparent power, while the load is normally described in kW of real power. The two are related through the power factor, so the same kVA figure delivers a different kW figure depending on the power factor used.

Working in round numbers, a 100 kVA generator at a power factor of 0.8 supplies 80 kW of usable continuous power. At a power factor of 0.9 the same 100 kVA supplies 90 kW. That is why a quotation that lists kVA alone has not told you the usable output.

One more distinction matters before you compare offers. A standby rating and a prime rating describe different loading limits and different daily running assumptions. Ask which one the number refers to, because the same label can sit on either.

The ten lines to confirm before comparing price

Most enquiries about a 100kVA diesel generator price in Nigeria arrive as a single figure, and a single figure cannot be checked without knowing what conditions it assumes.

Print both offers and work down this list. Where a line is missing on one side, the comparison is not yet valid.

The ten lines to confirm before comparing price
Quotation lineWhat it should state
Rated outputkVA and kW, and the power factor the kVA figure is quoted at.
Duty basisPrime or standby, with the hours per day the rating assumes.
Engine modelThe offered engine identified by model, not by brand name alone.
Alternator and AVRRating basis, frame and the excitation arrangement.
Controller and breakerController functions, breaker rating and protection scope.
EnclosureOpen or sound-attenuated, and the canopy treatment being supplied.
Changeover scopeWhether a transfer panel is included, its rating, and what it controls.
Fuel arrangementBase tank or separate storage, and how it travels with the set.
Cooling packageRadiator and ventilation sized for the site ambient.
Delivery termFOB China or CIF Lagos, with each party's responsibility named.

Original, silent and open configurations

Buyers often compare a silent offer from one supplier against an open offer from another and conclude that one is expensive. In practice the three common configurations are different products.

An open set is the least encumbered: the engine, alternator and radiator are exposed on a base frame. It is easier to service and suits a plant room with designed ventilation. A sound-attenuated canopy encloses the set, which buys placement freedom near occupied space at the cost of additional sheet metal, baffling, extra weight and a more demanding cooling design.

Some suppliers also describe a containerized arrangement, where the set sits inside a standard container. That form is worth comparing separately again, because it changes both transport and on-site access.

Because published prices are not used on this site, the honest way to compare the three is to ask each supplier for the same list of physical and electrical details, then price the configuration that actually fits your position.

Engine platforms available at this rating

Ask each supplier for the 100 kVA generator specification in writing, so both offers describe the same machine rather than the same label.

At 100kVA the quotation may be built around a Cummins, a Perkins, a Weichai or a Yuchai engine option, subject to written quotation and model availability. The platform affects the budget position, the fuel behaviour and, over the life of the set, how easily wear parts reach your city.

Engine choice also interacts with the alternator. A larger alternator frame at the same kVA handles motor starting more comfortably, so two 100kVA offers can behave differently on a site with a heavy pump or compressor even though the labels match.

Neither this page nor a quotation from this website claims authorised distributorship of any engine brand. What can be verified before payment is the offered engine model, the serial or nameplate evidence, the warranty route and the supplier's legal identity.

For a platform-by-platform view, see the Cummins versus Perkins comparison for Nigeria and the Cummins-powered generator guide.

Reading the CIF Lagos and FOB China cost structure

The delivery term decides where one party's responsibility stops and the other's begins, which is why it should sit next to the equipment scope rather than at the bottom of an email.

Under CIF Lagos the seller arranges and pays for cost, insurance and freight to Lagos port. Import duty, clearing, terminal charges and inland delivery normally fall to the buyer unless the quotation says otherwise in writing. Under FOB China the buyer's responsibility begins once the goods are loaded on board, so the buyer arranges the sea leg and insurance.

If you have your own freight forwarder, FOB can be the cleaner comparison because you control the freight. If you do not, CIF Lagos gives you a single reference point to the port, and you can then price clearance and inland transport locally.

The most useful practical step is to ask for one specification priced on both terms. That separates the machine from the freight and shows exactly what you are buying. More detail is in the FOB China versus CIF Lagos decision guide.

Send a 100kVA request that can be answered properly

Give the load list, mark the largest motor and its starting method, state how many heavy loads can start at the same moment, give the duty and the daily hours, name the voltage, phase and frequency, and say which delivery term you want quoted.

If the site can only be described as a rough total, say so. A rough total is still useful, and it is far better than letting a supplier assume a load profile. The 100kVA price and scope page covers the planning conversion for this rating, and the kW, kVA and kWh guide explains the units if you need to check your own figures.

Request a written 100kVA quotation

Send the load list and the largest motor, and ask for the ten lines above on one specification. If you want a comparison, ask for the same specification priced on both FOB China and CIF Lagos.

Get a written quotation

Three fields. We reply with the rating, the engine option and the delivery basis.

Send on WhatsApp

WhatsApp RFQ template

Hello, I need a 100kVA generator quotation for Nigeria. Please include the load list and the largest motor with its starting method, the duty and hours per day, the voltage, phase and frequency, whether the enclosure is silent or open, the ATS scope, and the delivery term.

Send this RFQ on WhatsApp

100kVA quotation questions

What is 100kVA in kW?

About 80 kW at a power factor of 0.8, or about 90 kW at 0.9. The conversion describes the set's usable output; your site requirement still depends on the connected load and the largest motor's starting current.

Why do two suppliers quote different amounts for the same 100kVA rating?

Because kVA is one line of a longer specification. Engine model, alternator, controller and protection, enclosure, changeover scope, fuel arrangement and delivery term all change the offer, so the same label can describe two materially different machines.

Is a silent set always the right choice for a 100kVA unit?

Choose from the position, not the size. A plant room with designed ventilation can take an open set; a position near offices, patients or a boundary is usually better served by a sound-attenuated canopy, which adds weight and cost.

What information is needed before a 100kVA price can be confirmed?

The load list with the largest motor and its starting method, the duty and daily hours, the voltage, phase and frequency, the enclosure requirement, the changeover scope and the delivery term you want quoted.

Do you hold 100kVA stock in Nigeria?

No warehouse stock claim is made. Availability, production timing and delivery arrangements are commercial matters to be confirmed in the written offer for the specific order.

Does CIF Lagos include clearance?

No. CIF covers cost, insurance and freight to Lagos port. Import duty, clearing, terminal charges and inland delivery are normally separate items and should be listed individually if they are being provided.