What a diesel levy should cover, and what it should not
A levy that passes through the cost of running the estate's generator should contain four things: fuel actually consumed, consumables such as filters and oil, routine servicing labour, and a contribution towards the eventual overhaul. Anything beyond those four is either a different charge or an unexplained margin.
It should not quietly absorb capital items. Replacing the alternator, rewinding a stator, or buying a second set are capital decisions that belong in a separate resolution with its own approval, not buried in a monthly line that residents cannot audit.
It should also not absorb losses that are not the residents'. Fuel lost to theft, a set run for hours to power a common area that was never agreed, or a contractor's own equipment plugged into the estate supply are all costs that need a decision, not an automatic pass-through.
The common formulas, and where each one leaks
The per-flat model divides total cost by the number of units. It is transparent and easy to administer, and it ignores the fact that a one-bedroom flat and a four-bedroom flat do not draw the same load. In a block with mixed unit sizes, it quietly transfers cost from large units to small ones.
The per-square-metre model divides by floor area. It tracks the capacity a unit could draw rather than what it does draw, which is a reasonable proxy when occupancy is similar and unfair when a large flat is empty for half the year.
The per-metered-unit model divides by actual consumption recorded at each unit's meter. It is the fairest of the three and the most demanding: it requires meters on every unit, readings taken on a fixed day, and a published rate per unit. Without those three, the model exists only on paper.
The failure mode common to all three is a changing denominator. If the number of paying units falls while the set keeps running, the rate per unit must rise, and residents experience that as an increase without explanation. Publishing the denominator alongside the rate is what makes the change legible.
Asking for the fuel ledger: what a transparent account looks like
A facility manager who is running an honest levy can produce a ledger in minutes, because the data is already being kept to buy the fuel. The ledger needs four columns: date, litres purchased, running hours recorded, and the price paid per litre. A fifth column for the tank dip before and after each delivery closes the loop against theft and leakage.
The running-hours column is the one residents should look at first. Litres divided by hours gives consumption per hour, and that figure should be stable for a given set and load. If it moves sharply without a change in estate load, either the logging is wrong or the fuel is going somewhere else.
Ask for the service invoices too. A levy that includes a servicing contribution should be matched by an invoice showing what was actually done. A levy that collects for servicing and produces no invoices is collecting for something else.
| Document | What it should show | What it proves |
|---|---|---|
| Fuel purchase receipts | Date, litres, price per litre, supplier | The money spent on fuel was actually spent |
| Tank dip log | Level before and after each delivery | Fuel delivered reached the tank |
| Running hours log | Hours recorded at each reading | Litres per hour, and whether consumption is stable |
| Service invoices | Parts, labour, date, set identification | The servicing element of the levy was carried out |
| Unit meter readings | Reading per unit per month | The denominator used for a metered split |
| Levy computation sheet | Total cost, denominator, rate applied | How the individual charge was derived |
| Overhaul reserve statement | Collected to date, held where | The reserve exists and is not general revenue |
Three bases compared: estate levy, own set, and grid supply
Residents compare a levy against two alternatives, and the comparison only means something if it is made on the same basis. The estate levy buys a share of a set that already exists, with no capital outlay and no maintenance responsibility. An own set buys independence and carries capital cost, service cost, fuel purchase, and the noise and space that come with it. Grid supply, where it is available and reliable, is priced per unit and delivers none of the generator's running cost.
The honest comparison is total cost per unit of electricity actually delivered, not the headline rate. A levy that looks high may still be cheaper than an own set running at low load, because a lightly loaded set is inefficient and the capital sits idle. A levy that looks low may be hiding a capital replacement that is coming.
Compare like with like: same number of units consumed, same hours of supply, same standard of availability. A comparison that ignores the hours of supply is not a comparison, it is a preference.
Writing it into the lease or the service agreement
The clause that prevents most disputes is the one that defines the basis rather than the amount. State which of the three models applies, what the denominator is, how often readings are taken, and how a change in the rate is notified.
Add a right to inspect the ledger, with a stated notice period. That single sentence changes the relationship from trust to verification, and it costs nothing to agree at the point of signing.
Finally, separate the capital from the running cost in the document. A clause that says major replacements require a separate resolution protects both sides: residents are not surprised by a large one-off, and the facility manager is not forced to fund a replacement out of a monthly line that was never sized for it.
When to query a charge, and what to bring
Query a charge when the rate moves without a published denominator, when consumption per running hour changes sharply, when the servicing element is collected but no invoices appear, or when a capital item appears inside a monthly line.
Bring the comparison, not the complaint. A short table showing litres purchased, hours run, units consumed and the rate applied, with the source of each figure, is far more effective than a general objection. If the figures are unavailable, ask for them in writing and record the date of the request.
Escalate in the order the agreement provides: facility manager, then the residents' association, then whatever dispute mechanism the lease names. Keep every exchange in writing, because a documented query is what makes the next increase negotiable.
Where to read next
Frequently asked questions
What is a generator levy in a Nigerian estate?
It is the part of a service charge that passes through the cost of running the estate's generator: fuel, consumables, routine servicing and usually a contribution towards an eventual overhaul. It should be separately identified rather than folded into a general charge.
How should a diesel levy be calculated?
By one of three bases: equally per flat, by floor area, or by metered consumption. Each should be published with its denominator so residents can see how their individual figure was derived, and the basis should be fixed in the lease or service agreement.
Can the estate increase the levy without notice?
The agreement normally sets out how a change is notified. A rate change without a published denominator or without the notice the agreement requires is a legitimate ground for a written query.
What documents can a resident ask to see?
Fuel purchase receipts, the tank dip log, the running hours log, service invoices, unit meter readings, the levy computation sheet, and any overhaul reserve statement. Each one proves a specific part of the charge.
Is a levy cheaper than buying my own generator?
It depends on how many units you actually consume and how many hours of supply you get. The comparison has to be made per unit delivered, including capital and service cost for an own set, not on the headline rate alone.
What if the estate collects a servicing charge but no service is done?
Ask for the service invoices with dates and parts listed. If they cannot be produced, the servicing element is not being spent as described and the query should go in writing to the facility manager and then to the residents' association.