A trailer set is specified by the road before it is specified by the load. The chassis must carry the gross mass with the coupling load the tow vehicle can take, the route must accept the height and weight, and the site must offer level ground and a cable run. Full-load current is kVA × 1000 ÷ (1.732 × 415): a 300 kVA set draws about 417 amps, which is past the point where one flexible cable run is a sensible answer.
What a trailer-mounted set is actually for
A trailer set exists because the load moves and the power has to follow it. That single fact changes the specification more than any other: the set has to be light enough to tow, stiff enough not to flex when it is pulled over a bad road, and quick enough to connect that a crew can be running again within an hour of arriving. A fixed set optimises for the cheapest installation it will ever have; a trailer set optimises for the hundredth installation.
The buyers who need one are recognisable. A plant hirer who supplies temporary power to construction sites. A quarry or a mill that opens a new pit or a new line faster than it can build a substation. An event or a telecom contractor whose sites change every few weeks. A factory that keeps one set as a fleet spare and moves it to whichever line has lost its supply.
What all of those have in common is that the set is not the only asset in the decision. The tow vehicle, the route, the ground at the destination and the cable run from where the trailer can stand to where the load is all sit inside the same problem, and a quotation that covers only the generator leaves the buyer to solve the rest after delivery.
Chassis, axle and suspension: what the tow rating covers
A trailer set is a road vehicle before it is a generator, and the chassis has to be specified for the road rather than for the load. Three figures matter: the gross mass of the trailer and set together, the load carried on each axle, and the load carried on the coupling. A single-axle trailer puts a large share of the mass on the tow ball, which is fine behind a light truck and wrong behind a vehicle whose rear axle is already loaded.
Suspension choice follows the terrain. Leaf springs are simple, cheap to repair anywhere and harsh on the set when the trailer runs empty over broken tarmac. Rubber or independent suspension rides better and costs more to repair in a workshop that has never seen the type. For a set that spends most of its life on paved roads between sites, the ride quality matters because the alternator and the control panel are being shaken on every trip.
The frame under the set deserves the same attention as the frame under the trailer. A skid designed to sit on a concrete plinth is not automatically stiff enough to span two trailer cross-members, and a set that flexes in transit will crack at the mounting feet long before the engine wears out. The anti-vibration mounts and the base frame are covered in foundation and vibration isolation; on a trailer the same logic applies with the added load path of the road.
Towing limits: mass, length and the route
Before a trailer set is ordered, someone should drive the route. Height restrictions, bridge weight limits, narrow compound gates and the turning circle at the destination decide whether the unit can arrive at all, and those are cheaper to discover with a tape measure than with a low-loader. Where the last kilometre is not road, the trailer becomes a sledge and the tow vehicle becomes the limiting factor.
Braking is the item most often left out of the specification. A braked trailer of the size that carries an industrial set needs either an overrun brake or a coupled air system, depending on the tow vehicle, and the coupling has to match. A trailer delivered with a coupling the buyer's truck cannot mate with is not a delivery problem; it is a specification problem that was visible in the enquiry.
Lighting and marking also belong to the road, not to the generator. A set that is moved at night or parked on a verge between jobs needs its road lighting to work off the tow vehicle and its reflectors to survive the first month. These are small items that decide whether the unit is usable as a mobile asset or only as a set that happens to have wheels.
Setting down: levelling, ground and the space around the set
A trailer set is level when the ground is level, which on a Nigerian site is often not the case. The set needs to sit flat for the oil to drain back correctly and for the coolant to stay where the engine expects it, so the trailer should carry its own jacking and packing arrangement rather than relying on whatever blocks are lying around. Four jacking points and a spirit level are worth more than a bigger rating.
The ground under the wheels is the second question. Soft ground after rain will take a loaded trailer down to the axle, and the recovery is a bigger operation than the delivery. Where the set will stand for weeks rather than hours, spreading the load with pads under the jacks and the wheels is the difference between a stable installation and a slow sink.
Space around the set is the third. A canopied set needs air in and air out, and the exhaust has to discharge where it will not be drawn back into the inlet or into a nearby window. A trailer parked against a wall with the exhaust facing it is a set that will derate and, worse, a set that will fill an enclosed yard with exhaust gas. The distance and direction questions are the same ones covered in generator installation location.
Cable and changeover: connecting without a fixed panel
The point of a mobile set is that it connects quickly, and the connection is the part most often improvised. Two arrangements are defensible. The first is a set with an integral output panel and a cam-lock or terminal arrangement that a competent electrician can land cables onto in minutes. The second is a set with a built-in changeover that accepts a single feed from the site and switches between the set and the incoming supply.
What is not defensible is a trailing lead run across a yard to a plug that was never rated for the current. The cable on a temporary supply carries the same current as a fixed one, and the arithmetic does not change because the set has wheels. The table below states that current for the ratings most often trailed, and what it implies for cable runs when each run is limited to a working maximum.
| Rating (kVA) | Full-load current at 415V (A) | Parallel runs at 400 A each |
|---|---|---|
| 100 | 139.1 | 1 |
| 200 | 278.2 | 1 |
| 300 | 417.4 | 2 |
| 400 | 556.5 | 2 |
| 500 | 695.6 | 2 |
| 600 | 834.7 | 3 |
The current column is kVA × 1000 ÷ (1.732 × 415), the same arithmetic as the kVA to kW and amps chart. The third column is not a cable schedule; it exists to show that above roughly 280 amps a single flexible run stops being a sensible answer, and that a trailer set above that size needs a planned connection rather than a long lead.
Earthing travels with the cable. A mobile set is a separably derived source while it is running, and the earth arrangement has to be re-established at every site rather than assumed from the last one. The practice is set out in earthing and grounding, and where the site has its own changeover the interaction is described in ATS panel selection.
Weather, dust and security on a set that lives outside
A trailer set is parked in the open far more than a fixed one, and the enclosure becomes the whole installation. Rain ingress usually arrives through the joints rather than the panels, so the door seals, the cable gland plate and the roof seam are the three places to inspect on delivery. Dust arrives the same way and settles on the control panel, which is where it does the most damage.
Cooling is the other half of weather. A canopied set standing in direct sun is already running hotter than its test condition before it takes any load, and a trailer set cannot be shaded by a plant room. That is the mechanism behind high-temperature derating, and it is why the ambient assumed in the quotation should be the temperature in the sun at midday rather than the temperature in the shade at nine in the morning.
Security is the last item and, for a mobile asset, the most expensive to get wrong. A trailer couples to any vehicle with the right hitch, so the coupling needs a lock, the wheels need a clamp or a lock nut, and the unit needs a record of its serial numbers and photographs held somewhere other than on the trailer. The wider set of measures is described in silent and canopied set supply.
Trailer, container or fixed: choosing the mounting
Three mountings solve three different problems, and the choice is usually decided by how many times the set will move rather than by the set itself. A fixed installation is the cheapest per year where the set never moves and the building already exists. A container is the right answer where the set moves a few times in its life and each move can be planned with a crane and a flatbed. A trailer is the right answer where the set moves often enough that planning each move is itself a cost.
The container has an advantage the trailer cannot match: it arrives as a locked, weather-tight room with the switchgear, the fuel tank and often the cable inside it, and it can be stacked or sat on a slab without further work. That arrangement is described in containerized generator sets. The trailer's advantage is that it needs no crane and no flatbed, which on a small site is often the whole argument.
Where the set will be towed between sites weekly, the specification should also cover the fuel tank. A tank sized for a fixed installation will be too heavy to tow full and will slosh on every corner; a smaller tank with a transfer arrangement at each site is usually the better compromise. Consumption at the duty the site actually runs is covered in diesel generator fuel consumption.
What to put in the enquiry
A trailer enquiry that gets a usable answer carries six items: the rating or the load, the tow vehicle and its coupling, the route including the last kilometre, whether the set will be parked in sun or shade, the cable distance from trailer to load, and how often the unit will move. Each of those changes the build, and the last one usually changes the answer more than the rating does.
Delivery should be stated at the same time. A trailer set shipped as deck cargo and one shipped inside a container are packed differently and are collected differently at the port; the sequence is described in container loading and the terms in CIF Lagos shipping. If the engine is a Cummins or a Perkins, the identity checks in genuine engine verification apply before the frame is built around it.
Where the unit will also serve on water or be lifted between a quay and a hull, the constraints change again and are set out in marine generator selection. The range of ratings available in a trailer build is listed on the products page, and the general sizing sequence is in the generator sizing guide.
Get a written quotation
Three fields. We reply with the rating, the engine option and the delivery basis.
Trailer generator FAQ
Can any generator be fitted to a trailer?
Almost any set can be mounted on a trailer, but the frame has to be built for it. A skid designed for a concrete plinth may not be stiff enough to span trailer cross-members, and a set that flexes in transit cracks at the mounting feet long before the engine wears out.
How much current does a 300 kVA trailer set draw?
About 417 amps per phase at 415V, from 300 × 1000 ÷ (1.732 × 415). That is above the point where a single flexible cable run stays sensible, so the connection should be planned rather than improvised.
Does a trailer set need a foundation?
It needs level ground and a way to spread the load under the jacks and wheels, not a cast foundation. The set should sit flat so oil drains back and coolant stays where the engine expects it, and soft ground after rain needs pads rather than blocks.
What coupling should a generator trailer have?
The one the buyer's tow vehicle can actually mate with, and it should be stated in the enquiry. A trailer delivered with an incompatible coupling is a specification problem that was visible before the order, not a delivery problem.
How often can a trailer set be moved?
As often as the route and the connections allow, which is why the specification asks for a moves-per-month figure. Frequent moves argue for a smaller fuel tank, a robust coupling and a connection that one electrician can land in minutes.
Is a container better than a trailer?
A container suits a set that moves a few times in its life and can be moved with a crane and a flatbed, and it arrives as a locked weather-tight room. A trailer suits a set that moves often enough that planning each move would itself be a cost.