WhatsApp: +86 157 0593 2345Email: miu@taiyudapu.comCall the factory: +86 157 0593 2345
Generator technical reference

kVA to kW and Amps: Generator Conversion Chart for Nigeria

A lookup chart for the three numbers that decide a generator size: apparent power in kVA, real power in kW, and current in amps. Read a row directly, or recompute any value with the formulas below.

Buyer answer

Read the chart row for the rating in kVA. At a power factor of 0.8 a set delivers 0.8 kW per kVA, so 100 kVA is 80 kW; at 0.85 it is 85 kW. Three-phase current is kVA × 1000 ÷ (1.732 × line voltage), which is 139 amps for 100 kVA at 415V and 144 amps at 400V. Motor starting is a separate check: divide the motor kW by its power factor, then multiply by the starting multiple for its starter.

How to read this chart

Read across a single row and you have the same machine described three ways. The first column is the rating the set is sold by. The next two convert that rating into real power at two different power factors. The last three convert it into current at the voltages used on Nigerian sites.

Two habits make the chart reliable. First, decide which voltage applies to the installation before reading any current column, because the difference between the 400V and 415V columns is not a rounding error. Second, treat the kW columns as two separate assumptions rather than one range: a load with a power factor of 0.85 does not sit halfway between them, it sits exactly on the second column.

If a rating is not in the table, the formulas below give the answer for any value, and they are the reason the table can be checked rather than trusted. Nothing in the chart depends on a particular engine or alternator; it is arithmetic applied to a rating.

The three formulas behind every row

Every figure in the chart comes from one of three relationships. They are written here so that any row can be recomputed, and so that a value outside the table can be derived rather than guessed.

Real power: kW = kVA × power factor. With a power factor of 0.8, a 250 kVA set delivers 200 kW. With 0.85 it delivers 212.5 kW. The kVA figure stays the same because it describes the machine; the kW figure changes because it describes the load the machine is feeding.

Three-phase current: amps = kVA × 1000 ÷ (1.732 × line voltage). The 1.732 is the square root of three, and it appears because the three phases share the total. For 100 kVA at 415V: 100 × 1000 = 100,000; 1.732 × 415 = 718.8; and 100,000 ÷ 718.8 = 139.1 amps, which is the figure in the chart.

Single-phase current: amps = kVA × 1000 ÷ voltage. There is no 1.732 term because there is one phase. For 100 kVA at 230V: 100,000 ÷ 230 = 434.8 amps. That is why the single-phase column is roughly three times the three-phase figure at a comparable voltage: the same apparent power is being carried on one conductor instead of three.

The reverse direction is just as useful. To go from a measured current back to a rating, multiply the current by 1.732 and by the line voltage, then divide by 1000. To go from a known real load back to a rating, divide the kW by the power factor.

The chart: kVA to kW and to amps

The table covers the ratings most often quoted for Nigerian projects, from small single-phase work up to large industrial sets. Each row is one rating; each column is one way of stating it. The 230V column applies to single-phase output, which on a three-phase set is a fraction of the total rather than the whole rating.

Generator kVA to kW at power factor 0.8 and 0.85, and to amps at 400V, 415V three-phase and 230V single-phase
kVAkW@0.8kW@0.85A@400V(3ph)A@415V(3ph)A@230V(1ph)
1088.514.413.943.5
151212.821.720.965.2
20161728.927.887.0
252021.236.134.8108.7
302425.543.341.7130.4
40323457.755.6173.9
504042.572.269.6217.4
60485186.683.5260.9
756063.8108.3104.3326.1
806468115.5111.3347.8
1008085144.3139.1434.8
125100106.2180.4173.9543.5
150120127.5216.5208.7652.2
160128136230.9222.6695.7
200160170288.7278.2869.6
250200212.5360.8347.81087.0
300240255433417.41304.3
350280297.5505.2486.91521.7
400320340577.4556.51739.1
500400425721.7695.62173.9
600480510866834.72608.7
750600637.51082.51043.43260.9
8006406801154.711133478.3
10008008501443.41391.24347.8
125010001062.51804.217395434.8
1500120012752165.12086.86521.7
2000160017002886.82782.48695.7

Why the columns differ, and which one to quote

A quotation that states only kVA leaves the buyer to work out the rest, and a quotation that states only kW hides the machine's rating. The practical rule is to quote kVA as the machine rating, kW at the power factor actually expected on site, and amps at the voltage the installation uses. That is three numbers from one row, and it removes most of the ambiguity in a comparison.

The two three-phase columns exist because both voltages appear in Nigerian practice. Equipment data sheets state one or the other, and a set configured for one is not automatically correct for the other. Reading the wrong column produces an error of only a few per cent, which is exactly the size of error that survives review and then fails at commissioning.

The single-phase column is the one most often misused. A 100 kVA three-phase set does not deliver 434.8 amps of single-phase power; that column describes what 100 kVA would be if it were delivered as single-phase, which is a different machine arrangement. Where a site needs a large single-phase supply, the correct approach is to state the single-phase load and let the set be configured for it, rather than to read across from a three-phase rating.

For the underlying definitions of real power, apparent power and energy, the companion page on kW, kVA and kWh covers the concepts; this page deliberately stays with lookups and arithmetic.

Working backwards from amps or from kW

Site measurements usually arrive as current, not as a rating. A clamp reading of 300 amps per phase on a 415V supply converts to 300 × 1.732 × 415 ÷ 1000 = 215.6 kVA. The next chart row above that is 250 kVA, and the row below is 200 kVA, so the reading sits on a set that is already close to its rating.

A load list usually arrives as kW. A site with 120 kW of running load at a power factor of 0.8 needs 120 ÷ 0.8 = 150 kVA before any allowance for starting or growth. That is a chart row, which is the point of the table: the arithmetic lands on a rating that can be quoted.

Both directions should be checked against the same row. If the current suggests 215.6 kVA and the load list suggests 150 kVA, the difference is information rather than a contradiction: it usually means the power factor assumed in the load list is better than the power factor the site actually presents, or that the measured current includes a load nobody listed.

Motor starting: the multiplier that decides the set

Running load and starting load are different questions, and the chart answers only the first. A set's ability to start a motor is best treated as a starting kVA capability rather than as a kW figure, because the alternator has to supply the current the motor demands in its first seconds, when the rotor is stationary and the current is at its highest.

The method is short. Take the largest motor's output in kW, divide by its power factor to get its running kVA, multiply by the starting multiple for its starter, and you have the starting kVA that motor presents. Add the other loads running at that moment, and compare the total with what the set can supply as a step load.

The multiples below are the usual ranges for the common starting methods. They are ranges rather than single figures because the actual value depends on the motor design, which is why the motor's own data sheet is the authority where it is available.

Motor starting current as a multiple of rated current, by starting method
Starting methodStarting current, as a multiple of rated current
DOL direct-on-line6–8 times the rated current
Star-delta starter2–3 times
Soft starter2.5–3.5 times
Variable frequency drive1–1.5 times

A worked case: a 45 kW motor at a power factor of 0.8 is 56.25 kVA running. Started direct-on-line at six to eight times, it presents 337.5 to 450 kVA for the duration of the start. Started star-delta at two to three times, the same motor presents 112.5 to 168.75 kVA. The starter choice moves the requirement by more than a step change in rating would, which is why it belongs in the enquiry.

Two cautions. A reduced-current starter reduces the starting torque as well as the current, so a motor driving a heavy load may not accelerate on a star-delta start even though the set can supply it. And a set that starts the motor comfortably still has to carry the rest of the site once the motor is running, so the running total is checked separately from the starting peak.

The same interaction is set out from the motor side in three-phase motor and generator sizing, and the general sequence for building the load list is in the generator sizing guide.

Two worked examples, start to finish

A small hotel. The load list comes to 96 kW of running load with a power factor of 0.9, all of it motor and resistive load with no large single motor. Divide 96 by 0.9 to get 106.7 kVA, then apply an operating margin for growth and for the site's ambient, which lands on the 150 kVA row: 120 kW at 0.8 or 127.5 kW at 0.85, and 208.7 amps per phase at 415V. The margin is a judgement, but the arithmetic that follows it is not.

A workshop with one large motor. The same 96 kW of other load, plus a 75 kW compressor started direct-on-line at a power factor of 0.85. The compressor is 88.2 kVA running and, at six to eight times, 529 to 706 kVA while starting. That starting figure is far above the running total, so the set is not chosen on the running load at all: either the set is sized for the starting step, or the compressor is started on a soft starter or a drive so that the step becomes manageable.

The second example is the reason this page exists. A chart read only at the running load produces a set that is comfortably adequate on paper and unable to start the plant it was bought for, and the correction is almost always in the starting method rather than in the rating.

Where the chart stops being enough

The chart converts a rating. It does not adjust that rating for the conditions the set will work in, and those adjustments are real: a set operating in a hot plant room or in direct sun delivers less than its nameplate figure, and the amount depends on the engine and alternator data rather than on a rule that can be tabulated. The mechanism is described in high-temperature derating.

It also says nothing about duty. A rating quoted as standby and a rating quoted as prime power are different promises about hours, and the same physical machine can carry both labels. Which one the site needs is a question about how the set will be used, covered in prime, standby and continuous ratings.

Finally, a set that has been sized correctly still has to be proven. A loaded run establishes that the machine reaches its rating and holds temperature, which is a different claim from the arithmetic on this page; what that test involves is described in load bank testing. Fuel consumption at the resulting load point is not part of this chart and is covered separately in diesel generator fuel consumption.

Get a written quotation

Three fields. We reply with the rating, the engine option and the delivery basis.

Send on WhatsApp

Conversion chart FAQ

How many kW is 100 kVA?

At a power factor of 0.8, 100 kVA is 80 kW. At 0.85 it is 85 kW. Both figures are in the chart, in the two kW columns.

How many amps is 100 kVA at 415V?

About 139 amps on a three-phase supply, which is the 415V column in the chart. The same 100 kVA at 400V is about 144 amps.

Why does the chart show two kW columns?

Because kW depends on the power factor of the load, not on the generator alone. The 0.8 column is the conventional assumption for mixed loads; the 0.85 column suits loads with a better power factor.

How do I size a generator for a motor?

Take the motor output in kW, divide by its power factor to get running kVA, then multiply by the starting method multiple to get starting kVA. Add the other loads that run at the same time and check the peak.

Is 400V or 415V used in Nigeria?

Both appear in practice, and equipment data sheets state which one applies. Use the voltage stated for the site, and read the matching column rather than the nearer one.