A factory generator is a system purchase. Generator rating, motor starting, transfer equipment, ventilation, fuel system and delivery scope must be checked together.
Prepare the factory load schedule first
Record the running kW or kVA of production lines, pumps, compressors, chillers, conveyors and site services. Identify the largest motor and its starting method. Equipment that starts together can require much more generator capacity than the normal running total.
Also confirm whether the set is emergency standby or expected to run for long periods as prime power. Allow a documented margin for future expansion, but avoid excessive oversizing that can lead to inefficient low-load operation.
Which industrial generator range should be reviewed?
| Initial range | Typical review | Important checks |
|---|---|---|
| 100-300kVA | Small production sites and essential factory loads | Motor starts, ATS rating and expansion margin |
| 300-500kVA | Medium production and mixed industrial loads | Load sequence, canopy or generator room and runtime |
| 500-2000kVA | Large plants, critical buses and heavy project loads | Synchronizing, redundancy, cooling, fuel and protection |
These are enquiry ranges, not final sizing results. The selected model must be checked against the actual load schedule and engine-alternator data.
For faster shortlist work, compare the
Process-based factories are usually quoted from the guide that matches the material flow: generator sizing for a block factory and generator sizing for a plastic factory both start from the largest directly-on-line motor rather than total connected load.
100kVA quote guide for lighter commercial production, the 250kVA project page for mixed factory demand and the 500kVA industrial quote guide when motor starts, chillers or larger process lines push the site toward heavier standby or prime duty.A comparable continuous-load case is described in block factory generator requirements.
The set is not the whole project, and the site-side items that sit outside it are set out in what installation involves and costs.
Make supplier quotations comparable
Ask every supplier to state standby or prime rating, engine and alternator model, controller, output breaker, ATS scope, enclosure, voltage and frequency, test documents, packing, warranty handling and shipment term. Compare FOB China and CIF Lagos separately.
Nigeria Generator Supply is a China-based factory-direct supply website. A Nigerian warehouse, installation team or local service office is included only when it is specifically written into the quotation.
Before approval, compare the written quotation with the factory test and shipping proof center, the factory acceptance test guide and the pre-shipment inspection checklist so the commercial scope matches the real machine evidence.
Sector guides that follow the same quotation checklist are available for construction site power sizing, pharma process and utility loads and textile machinery load sizing. Buyers in Jos and the surrounding mining belt should also read the Jos mining and processing power notes, because haulage and inland delivery change the landed cost.
Get a written quotation
Three fields. We reply with the rating, the engine option and the delivery basis.
Frequently asked questions
How do I size a generator for a factory in Nigeria?
Use a complete running-load and motor-starting schedule, then confirm duty and expansion margin.
Does a factory generator need an ATS?
Use an ATS when automatic transfer is required, with its current rating and control interface matched to the site.
Can you quote CIF Lagos?
Yes, subject to the selected generator and current shipment details.