There is no single 100kVA price, because two offers at this rating can differ in engine option, alternator, controller, enclosure, changeover scope and freight term. A number without those lines cannot be compared with another number.
Why this rating is the entry to serious backup
At 100kVA the site usually has a distribution board, a changeover arrangement and more than one load group. That means the generator has to be specified as part of a system rather than dropped in as an appliance.
The planning conversion is straightforward: 100kVA is approximately 80kW at a 0.8 power factor. Prime and standby values should be stated separately, because continuous operation and outage backup are different assumptions with different loading limits.
The complication is rarely the total. It is the largest motor, the number of heavy loads that start at the same moment, and whether the site can sequence them. Those three answers decide whether 100kVA is comfortable or marginal.
Lines to compare one by one
Print both offers and work down this list. Where a line is missing on one side, the comparison is not yet valid.
| Comparison line | What to look for |
|---|---|
| Duty basis | Prime and standby values stated separately, with the hours per day assumed. |
| Engine option | The offered model named specifically, not a brand or a family. |
| Alternator and AVR | Rating basis, frame and the excitation arrangement used. |
| Controller and breaker | Controller functions, breaker rating and the protection scope included. |
| Enclosure | Open or attenuated, with the canopy treatment and its weight consequence. |
| Changeover | Whether an ATS panel is supplied, its rating, and what it controls. |
| Fuel arrangement | Base tank or separate storage, and how it travels. |
| Delivery term | FOB China or CIF Lagos, with each party's responsibility named. |
When to ask for FOB and CIF on the same machine
Ask for both whenever the buyer intends to control part of the logistics, or whenever two suppliers quote different terms and the comparison is drifting. One specification priced on two terms separates the machine from the freight, which is the only way to see what is actually being bought.
CIF Lagos gives a port-based reference. Inland transport, customs clearance, installation and commissioning are separate responsibilities and should each be listed, because the point at which one party's scope ends is where most disputes begin.
If the site is inland, ask for the port of discharge and the inland leg separately so the buyer can weigh a local carrier against the supplier's arrangement.
Before you compare vendor offers, the 100kVA quotation checklist lists the twelve items a written quotation should answer.
Planning specifications for this rating
Treat the following as planning items to be filled in by the quotation, not as assumptions.
| Planning item | What the quotation should state |
|---|---|
| Rating basis | 100kVA and approximately 80kW at 0.8 power factor, with prime and standby separated. |
| Electrical output | Site voltage, three-phase configuration, frequency, breaker and neutral arrangement. |
| Engine platform | The exact engine model rather than a brand name alone. |
| Alternator and controller | Alternator identification, controller functions, protections and battery arrangement. |
| Enclosure and changeover | Open or silent type, canopy treatment, ATS rating, and whether site cabling is excluded. |
| Commercial term | Generator price, optional equipment and the delivery scope shown separately. |
Comparing this rating with the next steps up
If the load list sits close to the 100kVA envelope, price the next band on the same specification before deciding. The difference between a comfortable set and a marginal one is far smaller than the cost of replacing a set, or of living with nuisance trips.
Related: 250kVA generator price Nigeria, 500kVA generator price Nigeria, Cummins generator models, fuel consumption calculator.
Get a written quotation
Three fields. We reply with the rating, the engine option and the delivery basis.
100kVA quotation questions
How much is a 100kVA diesel generator in Nigeria?
It depends on the specification, not on the rating alone. Duty basis, engine option, alternator and controller, enclosure, changeover scope, fuel arrangement and delivery term each move the number, so offers must be compared line by line.
Does CIF Lagos include installation?
No. CIF describes the freight and insurance responsibility to the port. Inland transport, clearance, installation and commissioning are separate items and should be listed explicitly if they are being provided.
Do you hold 100kVA stock in Nigeria?
This page does not claim Nigeria warehouse stock. Availability, production timing and delivery arrangements are commercial matters to be confirmed in the written offer for the specific order.