WhatsApp: +86 157 0593 2345Email: miu@taiyudapu.comCall the factory: +86 157 0593 2345
Buying wholesale

What a Generator Really Costs Landed in Nigeria: Duty, VAT and the Naira Figure

FOB is not landed cost. Here is the five-line stack Nigerian importers pay, with a calculator and a worked example you can check line by line.

Short answer. A generator quoted at a given FOB price does not land in Nigeria at that price. Duty, levies, VAT, freight, insurance and clearing sit on top of it, and in Nigeria they compound: VAT is charged on the duty and levies as well as on the goods. Working the stack out before you commit is the difference between a margin and a loss, and it is the calculation most first-time importers do last instead of first.

The five lines in the stack

Every landed cost calculation for a generator imported into Nigeria reduces to the same five lines. Get those right and the total is arithmetic; get the order wrong and the VAT line alone will be understated.

  • CIF value — FOB price plus ocean freight plus insurance. Insurance is usually quoted as a small percentage of FOB plus freight.
  • Import duty — a percentage of CIF, set by the tariff band for your HS code. Generating sets do not all sit in one band, so confirm the rate for the code your clearing agent will use.
  • Surcharge and levies — commonly a 7 per cent surcharge on the duty itself, a 1 per cent CISS levy on FOB, and a 0.5 per cent ETLS levy on CIF. These are percentages of different bases, which is exactly why people get them wrong.
  • VAT — 7.5 per cent, charged on CIF plus duty plus surcharge plus levies. Not on the CIF value alone.
  • Clearing and inland delivery — terminal handling, agent fees, transport to your site. Fixed per shipment more than per unit, which is why the per-unit figure falls as quantity rises.

Work out your own figure

Change any field. The default duty rate is set to 10 per cent, which is a common tariff band for generating sets; confirm the rate that applies to your code on the Nigeria Customs Service tariff before you rely on the result. The exchange rate is prefilled from a public rate published on 13 November 2026 and is meant to be replaced with the rate your bank actually gives you.

A worked example you can check

Worked landed cost for one 100 kVA set, assumptions stated
LineCalculationAmount (USD)
FOB priceAssumed mid-band for a 100 kVA set5,975
Ocean freightAssumed per-unit share for one set900
Insurance0.5% of FOB + freight34
CIF valueSum of the three lines above6,909
Import duty10% of CIF691
Surcharge7% of the duty48
CISS1% of FOB60
ETLS0.5% of CIF35
VAT baseCIF + duty + surcharge + CISS + ETLS7,743
VAT7.5% of the VAT base581
Landed totalVAT base + VAT8,324
In nairaAt 1,350.46 NGN per USD, 13 November 202611,240,830

Two things are worth noticing in that table. First, the gap between FOB and landed is around 39 per cent on this assumption set, which is why a 5 per cent price difference between two factories is often less significant than a 5 per cent difference in the duty band. Second, the freight line is the least stable number in the calculation and the one most often left out when buyers compare suppliers.

What the calculation cannot know

  • Your actual freight rate. It moves with the shipping market, the port pair and how the cargo is loaded. Replace the default with the number on your forwarders quote.
  • The tariff band your code falls in. This is the single largest swing in the calculation and it is a question for a customs broker, not a website.
  • Terminal and storage charges at the destination. These are per shipment and per day; a container that waits costs money that no per-unit formula captures.
  • Exchange rate at the moment you pay. The default here is a public rate from one date; your bank will apply its own, and a deposit paid weeks before clearing converts at a different rate from the duty you pay on arrival.

Using the number properly

A landed cost figure is not a price you can quote to a customer until you decide what margin to add and what credit you are extending. Dealers who import successfully usually work backwards: take the resale price their market will bear, subtract the landed cost, and see whether what remains covers the waiting time and the stock risk. If it does not, the correct answer is a smaller quantity or a different rating, not a longer negotiation with the factory.

For the FOB side of the calculation, start from the rating-by-rating price bands. For the shipping side, the LCL guide explains when a shared container beats a full one, and the wholesale supply overview sets out how quantity, payment and clearing interact.

Confirming the duty band is a five minute job, not a guess

The duty line is the largest single variable in the stack and it is also the one buyers treat most casually. Generating sets are classified under the 8502 heading, and the rate that applies depends on the specific subheading, the power source and, in some cases, the output range. Two shipments that look identical on a quotation can attract different rates if they are declared under different codes.

The practical route is to ask your clearing agent for the code and rate in writing before the vessel sails, and to check that the code matches what the invoice and the packing list describe. If the documents describe an item differently from the code declared, the mismatch surfaces at the terminal, where it costs storage rather than a phone call.

Freight: the line buyers underestimate

Ocean freight is quoted per container or per cubic metre, and it moves with the shipping market rather than with the price of the machine. A generator bought at a good FOB price can lose that advantage entirely if it ships in a container loaded to a third of its capacity. This is why quantity and freight belong in the same decision: the per-unit landed cost is a function of how many sets share the fixed cost of getting the box to Lagos.

Insurance is the smallest line and the easiest to forget. It is calculated on FOB plus freight, so it rises with the freight you pay, and it is the only line that protects you against a loss you cannot negotiate your way out of after the fact.

Frequently asked questions

What percentage should I add on top of FOB to land a generator in Nigeria?

On the assumptions shown here the add-on is around 39 per cent, but it is not a rule. It moves with the duty band for your code, the freight rate you are quoted, the levies and the exchange rate. Build it from the five lines rather than applying a fixed percentage.

Is VAT charged on the duty as well as the goods?

Yes. Nigerian VAT on imports is calculated on CIF plus duty plus the surcharge and levies, so the effective VAT is higher than 7.5 per cent of the goods value alone.

Which exchange rate should I use?

The rate your bank applies when you pay, not a published mid-market rate. A deposit paid weeks before clearing converts at a different rate from the duty paid on arrival, so a range rather than a single number is the honest answer.

Does a higher duty band apply to larger generators?

Generating sets are not all in one tariff band, and the rate depends on the code used for your shipment. Confirm the code and the rate with a customs broker before you commit, because this line can swing the total more than any supplier negotiation.

Why is freight per unit lower when I ship more sets?

Because terminal handling, documentation and agent fees are charged per shipment rather than per unit. Ten sets share one set of fixed charges, so the per-unit figure falls as quantity rises.

Can I use this calculator for a container load?

Yes, if you enter the per-unit freight share. For a full container, divide the container freight by the number of sets loaded, and add the clearing figure you expect for the whole shipment divided the same way.

Get a written quotation

Three fields. We reply with the rating, the engine option and the delivery basis.

Send on WhatsApp