The house does not have a generator size. The appliance list does. Two three-bedroom flats with the same floor plan can need different sets if one runs two air conditioners and the other runs one, and a small shop can need more than either.
Sizing starts with a list, not a rating
The question people ask is what size generator they need. The question that produces a usable answer is what they want to run at the same time, and for how long. A generator is sized against a load, and the load is a list of appliances with a running figure and a starting behaviour each.
The reason this matters is that houses in Nigeria are not uniformly loaded. Two buildings of the same size can differ by a factor of two in electrical demand depending on how many air conditioners they carry, whether the water is pumped or gravity-fed, whether there is a borehole, and whether anybody works from home during a power cut. Sizing on floor area averages all of that away and produces a number that is wrong in both directions.
The good news is that the list is not difficult to build. It takes one walk through the house with a notebook, reading the nameplates on the appliances that matter, and writing down how many of each there are. The next section sets out what belongs on it.
Building the appliance list
Go room by room and record four things for each appliance: how many there are, the running load from the nameplate, whether it has a motor or compressor, and whether it is likely to be on at the same time as the others. That last column does most of the work later, because a house rarely runs everything at once and the size should reflect what it actually does.
The table below groups the appliances that appear in most homes. It deliberately does not print typical wattages, because the nameplate on your appliance is the only figure that applies to your house, and published averages vary widely between models of the same type.
| Appliance group | Usually on the list | What to record | Runs at the same time as the rest? |
|---|---|---|---|
| Lighting | Yes | Number of fittings and the wattage on each lamp | Partly — some circuits stay on all evening |
| Air conditioners | Yes, if fitted | Running load, number of units, cooling capacity | Often — this is the group that decides the answer |
| Refrigerator and freezer | Yes | Running load and age; older units cycle harder | Yes, continuously |
| Water pump or borehole pump | Yes, if fitted | Motor rating and whether it is single or three phase | Intermittently, but with a hard start |
| Television, decoder, router, chargers | Yes | Small individual loads, but they add up | Yes, most evenings |
| Microwave, kettle, iron | Yes | Heating appliances draw heavy load for short periods | Rarely together, but often with the air conditioners on |
| Washing machine | Sometimes | Motor load and heater if it has one | Rarely with the iron or kettle |
| Workshop tools, welder, grinder | Only if the house is also a workshop | Motor rating and starting method | Usually alone, but each start is heavy |
| Security, gates, CCTV, booster pump | Often | Small continuous loads, easy to forget | Yes, continuously |
The one appliance that decides the size
Almost every home has one load that is much heavier at the instant it starts than while it runs. An air conditioner compressor, a borehole pump, a refrigerator, a washing machine motor — each of them draws a surge when it starts, and the generator has to be able to supply that surge without the voltage collapsing or the engine stalling.
This is why two houses with the same running total can need different generators. A house whose largest motor is a small pump and a house whose largest motor is a large air conditioner may add up to similar running loads, but the second one puts a much heavier demand on the set at the moment of starting. The method for handling that is set out in sizing for motor starting loads, and the short version is that you size for the start rather than only for the run.
There are ways to soften the problem without buying a bigger set. Starting the air conditioners in sequence rather than all at once, using a soft starter on a pump, or choosing inverter-driven air conditioners all reduce the surge. If the installation will have an automatic transfer switch, sequencing can be built into the changeover so the heavy loads come on in a controlled order, which is one of the things an ATS panel can be configured to do.
The three-bedroom flat profile
A three-bedroom flat is usually the simplest list: lighting, a refrigerator, a television and router, a few small chargers, and one or two air conditioners in the bedrooms. Often there is no pump, because water arrives from a tank or a shared supply. The load is dominated by the air conditioners, and the rest of the list is small enough that it barely changes the answer.
The practical decisions at this level are about how many air conditioners run together and whether the flat will ever add a third. Buying for the flat as it is today is sensible; buying for a third bedroom that does not exist is how people end up with an oversized set running at low load, which is bad for a diesel engine over time.
At this scale the choice is usually between single-phase and a small three-phase set, and that decision is covered in single phase versus three phase at small ratings. The band itself — small sets of the kind used for a flat — is discussed in choosing within the small silent band.
The duplex profile
A duplex usually doubles the air conditioning and adds a pump, because the building has more than one level and water has to be lifted. It also tends to add the loads that a flat does not have: a gate motor, external security lighting, sometimes a small workshop or a laundry with a heavy appliance. The list gets longer faster than the floor area suggests.
Two features make the duplex different rather than just bigger. The first is simultaneity: with two floors occupied, more of the list is on at the same time in the evening, so diversity helps less than it does in a flat. The second is the pump, which is a hard-starting motor that often runs while the air conditioners are already on.
That combination is what pushes a duplex out of the smallest band. It is also where the case for a three-phase set starts to make sense, because the heavy loads can be spread across phases and the cable sizes come down. What the phases mean in practice is explained in kW, kVA and kWh explained, and the full sequence from list to quotation is in the sizing guide.
The small shop profile, and why it differs
A shop looks smaller than a duplex and often needs a comparable set. The reason is the load mix rather than the floor area: freezers and display chillers that run continuously, lighting that stays on all day, a point-of-sale system, sometimes a small air conditioner, and in many cases a barber's or a tailor's equipment with motors on it.
Chillers and freezers are the deciding load in most shops, because they are continuous and because they must not be interrupted. A set that is marginal for a home may be entirely unsuitable for a shop that cannot afford a defrost cycle to be cut short. The duty becomes closer to prime power than standby, which changes both the rating and the maintenance schedule.
That continuous duty is the reason the shop case often lands on a slightly larger set than the appliance total suggests, and why the running economics matter more than the purchase price. What drives fuel consumption at part load is covered in diesel generator fuel consumption, and the running-cost comparison against an inverter is in generator versus inverter running cost.
Single phase or three phase
Most homes in Nigeria are wired single phase, and a single-phase generator matches that wiring without any change to the distribution board. Three-phase sets exist at small ratings, but they only help if the installation is three phase or is being rewired anyway.
The exception is a building with a heavy single load — a large pump, a workshop machine, or a big air conditioning system — where three phase allows the load to be spread. Converting a single-phase house to three phase to suit a generator is almost never worth it; choosing a generator that matches the existing installation usually is.
There is a second-order point that catches people out: a three-phase set loaded only on one phase is running well below its capacity, which is inefficient and can damage the alternator over time. If the set is three phase, the loads should be balanced across the phases. That is an installation decision, not a purchase decision, and it is discussed in what installation involves.
Enclosure, siting and the neighbours
In a residential compound the enclosure matters as much as the rating. A silent canopy set reduces the noise at the boundary, which is often the difference between a set that can run in the evening and one that cannot. It also protects the machine from rain and dust, which extends the intervals between services.
Siting decides whether the canopy actually works. A set pushed against a wall, under a stair, or into a recess with no airflow will recirculate its own hot air and derate, no matter how good the canopy is. The exhaust has to point away from windows and from the neighbour's boundary, and there has to be room to open the access doors for servicing.
These are the same constraints that apply at any scale, and they are cheaper to solve on paper than after the set is delivered. What the installation side of the budget covers is set out in generator installation cost.
Send the appliance list and get a sized quotation
Tell us the number of air conditioners, whether there is a pump, what the biggest motor in the house is, and whether the installation is single or three phase. The quotation can then be built from your list rather than from a guess about the building.
Get a written quotation
Three fields. We reply with the rating, the engine option and the delivery basis.
Home generator sizing questions
What size generator do I need for a 3-bedroom flat?
It depends on the appliance list rather than the floor plan. A flat with one air conditioner and no pump carries a much lighter load than the same flat with two air conditioners, a pump and a freezer. Build the list, take the running loads from the nameplates, add the starting margin for the largest motor, and the rating follows from that.
Can I size a generator by the number of bedrooms?
No, and it is the most common source of expensive mistakes. Bedrooms correlate with floor area, not with electrical load. Two flats with the same plan can differ by a factor of two depending on air conditioning and pumping, and a small shop can need more than either.
Do air conditioners decide the generator size?
They usually dominate it, because they are the largest load that runs for long periods and because compressor starting is heavy. If the house has two or three air conditioners, the sizing conversation is mostly about how many run at once and whether they start together.
Is it better to buy a bigger generator than I need?
Not usually. An oversized set runs at low load, which is poor for a diesel engine over time, wastes fuel and costs more to buy. Size for the real list plus a sensible allowance for the next appliance, rather than for a load the house will never carry.
Do I need a three-phase generator for a house?
Only if the house is already wired three phase or is being rewired. A single-phase set matches a normal domestic installation without changes. Three phase helps where there is one very heavy load, but converting a single-phase house to suit a generator is rarely worth it.
How do I stop the generator tripping when the air conditioners start?
Sequence the starts rather than bringing every heavy load on at once, use a soft starter on a pump if one is fitted, and make sure the set was sized for the starting surge rather than only the running total. An automatic transfer switch can be configured to bring loads on in a controlled order.