Twenty kVA is a useful size because it absorbs a little growth without becoming a commercial plant. It is also the size where buyers most often skip the load list, because it feels large enough to be safe. It is not.
What 20kVA gives you in practice
At the planning power factor of 0.8, a 20kVA set delivers 16kW. The extra capacity over a 15kVA set is small in absolute terms, but it changes what the site can do: it absorbs one more air conditioner, a slightly larger pump, or a little headroom for growth without moving into the next commercial band.
That headroom is the real reason buyers choose this rating. A set run close to its limit for long periods wears faster and is less tolerant of a load that grows; a set with a margin is easier to live with. The margin has to be real, though, and it is created by the load list rather than by the label.
As with every rating, the offer should state the duty basis. A prime rated set and a standby rated set with the same kVA label do not carry the same continuous load, and the difference matters most at exactly this size, where the set is often asked to run for long stretches.
Loads that suit a set at this size
A 20kVA set is comfortable where the load is a mix of lighting, electronics, refrigeration and one or two motors that start separately. A shop with freezers and lighting, a small office suite with air conditioning, a guest house, or a house with a managed load all fit that description.
It becomes marginal where a single motor is large relative to the set. A cold room compressor, a borehole pump or a workshop machine can each be a significant share of 16kW, and the surge at start is what decides whether the set holds. The size of the motor matters less than the way it starts.
| Load pattern | Fit at 20kVA | The check that decides it |
|---|---|---|
| Lighting, electronics and fans | Comfortable | Total connected load and how much runs together. |
| Refrigeration and freezers | Usually comfortable | Compressor starting method and how many start together. |
| Air conditioning, a few units | Comfortable if staggered | Whether the units are inverter driven and whether they start together. |
| Borehole pump plus house load | Marginal | Pump rating, starting method, and what else is running at the time. |
| Small workshop with several motors | Marginal to unsuitable | The largest motor and how often it starts under load. |
| Cold room plus shop load | Marginal | Compressor surge with the shop load already on. |
The boundary this rating does not cross
A 20kVA set is not a building supply. It is not sized to carry a whole commercial building with lifts, chillers or a large kitchen, and it is not a factory supply. Where a site has a three-phase distribution board feeding several departments, the load is almost certainly beyond this rating.
The boundary is not a number on a chart; it is the point where the largest motor's starting surge, plus the load already running, exceeds what the set can supply. A site can be inside the rating on running load and outside it on starting, and that is the most common way a 20kVA purchase disappoints.
The other boundary is simultaneity. A guest house where every room's air conditioner runs at night draws far more than the same guest house during the day. The load list has to describe the worst hour, not the average one.
Site constraints that decide the installation
In dense parts of Lagos the set is often installed in less space than it needs. Three constraints decide whether a 20kVA set works where it is wanted: air, access and noise.
Air is the first. A canopy needs air in and air out, and a set pushed into a corner with one side against a wall will run hot regardless of its rating. The soundproof versus open comparison explains why the canopy makes this worse if the air path is squeezed.
Access is the second. The set has to arrive, be lifted or rolled into position, and be reachable for service. A position that requires dismantling a wall to service the set is a position that will not be serviced.
Noise is the third, and it is a neighbourhood question as much as a technical one. A set serving a shop below residential floors needs attenuation, and the mounting has to deal with vibration as well as airborne noise. The silent set page for Lagos covers the siting pattern in more detail, and the installation scope page lists the works that are easy to leave out of a quotation.
20kVA against the sizes either side
Buyers usually arrive at 20kVA by narrowing from both directions, so it is worth seeing the three ratings side by side. The differences are not just capacity: the alternator, the enclosure and the installation all change at these boundaries.
The 15kVA page covers the smaller option in detail, and the 25kVA page covers the next step up. Where the site sits inside a band rather than at a single rating, the 10 to 30kVA band page is the better starting point.
| Consideration | 15kVA | 20kVA | 25kVA |
|---|---|---|---|
| Usable output at 0.8 power factor | 12kW | 16kW | 20kW |
| Typical fit | Shop, office unit, house with a managed load | Shop with refrigeration, guest house, office suite | Larger shop, small hotel, light commercial |
| Room for growth | Little | Some | More |
| Where it stops | One significant motor plus light load | Two motors if they do not start together | Still not a building supply |
Starting current is the deciding figure
Two sites with identical load lists can need different sizes, because one starts its pump direct on line and the other starts it gently. The starting method changes the surge the alternator must supply, and the surge is what the engine has to recover from.
Ask the supplier to size against the largest motor's starting method, and ask what happens when that motor starts with the rest of the load already connected. A supplier who answers that question has done the work; one who quotes from the kVA figure has not.
Where the answer is uncomfortable, there are three routes: a larger set, a gentler starting method, or a sequenced start in which the motor is brought on before the other loads. The third is the cheapest and the most often overlooked.
Sizing it once, properly
Build the list from rating plates, mark what runs at the same time, and convert to kW at the power factor you are planning with. Then check the largest motor separately. That is the whole method, and it takes less time than correcting a wrong order.
The sizing guide sets out the sequence, and the kW, kVA and kWh page explains the conversion. If a changeover is part of the plan, the ATS panel page covers what has to be specified with it.
What to put in the enquiry
The enquiry that produces a comparable quotation contains the load, the largest motor, the phase and voltage, the position and the delivery term. Everything else is detail that can follow.
| Item | Why the supplier needs it |
|---|---|
| Loads that run together | Sets the running requirement. |
| Largest motor and starting method | Sets the surge requirement. |
| Phase, voltage and frequency | Sets the alternator configuration. |
| Position and enclosure | Sets the canopy and the site works. |
| Changeover requirement | Decides whether it is in the offer. |
| Delivery term | Decides where the seller's responsibility ends. |
Questions buyers ask about this size
These are the questions that come up most often at 20kVA. Where an answer depends on the site, the page states the check rather than a figure that would not hold.
Send the load and the largest motor
Tell us what runs together, the largest motor and how it starts, the phase and voltage, and where the set will sit. We will confirm the size before quoting, and tell you if 20kVA is not the right answer.
Get a written quotation
Three fields. We reply with the rating, the engine option and the delivery basis.
Frequently asked questions
How many kW is a 20kVA generator?
At a power factor of 0.8 a 20kVA set delivers 16kW. The offer should state the power factor and the duty basis it was built on.
Is 20kVA enough for a shop with freezers?
Usually, provided the compressors do not all start together and the largest one is checked against the starting surge. A shop with several large compressors starting at once may need the next size up.
What is the difference between 15kVA and 20kVA?
Four kW of usable output at the planning power factor, plus a little more tolerance for growth. The practical difference is whether the site can add one more significant load without changing the set.
Can a 20kVA set run a small guest house?
It can, if the load is managed and the air conditioners do not all start at once. The worst hour, not the average, is what decides the size.
Does a silent canopy reduce capacity?
It does not change the rating, but it changes the airflow. A canopy with a restricted air path will make the set run hotter, which is an installation problem rather than a rating problem.
Can I install a 20kVA set on a balcony or roof?
Only with an engineered mounting that carries the weight and deals with vibration, and only with an air path that works. This is a structural question before it is a generator question.
Should I buy 20kVA or go straight to 25kVA?
If the load list shows the site close to 16kW with growth expected, the larger rating avoids exchanging the set later. If the load is comfortably below, the smaller rating is the better fit.