The rating on the plate is not the load the site can carry. The gap between the two is the starting surge of the largest motor, and that is the number that decides whether a 15kVA set is right or merely close.
What a 15kVA rating actually delivers
A generator is rated in kVA because the alternator carries apparent power, but the equipment on site consumes real power in kW. The conversion between the two is the power factor, and at the planning figure of 0.8 a 15kVA set delivers 12kW. That single line explains most of the disappointment buyers feel after installing a set that looked large enough on paper.
The second thing the rating does not tell you is how the set behaves when a motor starts. A motor at rest draws a multiple of its running current for the first moments, and the alternator has to supply that surge while the engine recovers its speed. A set can be comfortable on the running load and still stumble on the start, which is why sizing is done against the largest single motor rather than against the total.
Third, the rating is quoted on a duty basis. A set described as prime rated is intended for continuous work at a stated load; a standby rated set is intended for shorter periods and a lower load. Two sets carrying the same kVA label can therefore have different continuous capability, and the offer should say which basis it uses.
Which loads a set at this size handles well
The loads that suit a 15kVA set share a characteristic: they are lighting, electronics and small motors that start one at a time. A shop with lighting, a freezer, a point-of-sale system and a fan is the classic case. An office unit with computers, air conditioning and lighting is another.
The loads that cause trouble are the ones where several motors start together, or where a single motor is large relative to the set. A borehole pump, a cold room compressor, a workshop saw and an air-conditioning compressor all fall into that group, and each has to be checked on its own.
The table below is a way to sort a site's loads before any quotation is requested. It is deliberately qualitative, because the decisive figure is on each appliance's rating plate rather than in a generic list.
| Load type | What it demands from a 15kVA set | What to check before ordering |
|---|---|---|
| Lighting and electronics | Steady, predictable draw with no starting surge. | Total connected load, and whether it runs all at once. |
| Small refrigeration | A compressor that starts against pressure, so the surge is higher than the running draw. | The compressor's starting method and whether other loads are on at the same time. |
| Air conditioning | Repeated compressor starts through the day, each one a surge. | How many units start together, and whether they are inverter driven. |
| Borehole or booster pump | A single motor that may be a large fraction of the set's output. | Motor rating, starting method, and the depth it is lifting from. |
| Workshop tools | High inrush on induction motors, often switched on under load. | The largest tool, and whether it starts with the set already loaded. |
| Office equipment | Low draw, but sensitive to voltage and frequency stability. | Whether any equipment needs a stabilised supply. |
Where 15kVA stops being enough
This is the part buyers skip, and it is the part that decides whether the purchase works. A 15kVA set is not a building supply. It is not sized to carry a whole house with several air conditioners running together, and it is certainly not a factory supply.
The clearest warning sign is a load list where the largest motor is a significant share of the set's output. Once a single motor's starting surge approaches the set's capability, every other load becomes a compromise: something has to be switched off before the motor starts, or the set has to be larger.
The second warning sign is growth. A site that expects to add a cold room, a second air conditioner or a pump next year is not a 15kVA site this year, because the set will be exchanged rather than extended. Where growth is likely, the smaller rating costs more over its life than the next size up.
The third is simultaneous operation. A house where the air conditioners, the borehole pump and the kitchen run together is drawing far more than the sum of what each draws separately, because they overlap. The load list has to be built on what runs at the same time, not on what is installed.
Silent or open, single phase or three phase
At this size the enclosure decision is usually made by where the set sits rather than by preference. A set installed beside a shop front or under a bedroom window needs attenuation; a set in a detached plant room or behind a wall may not. The soundproof versus open comparison covers what a canopy does and does not fix.
The phase decision is made by the load. Small single-phase loads can be served by a single-phase set, but a site with a three-phase pump, a three-phase compressor or a three-phase distribution board needs a three-phase set. Retrofitting phase later is not a modification; it is a different machine.
A common mistake is to order a three-phase set for a site that only has single-phase loads, on the theory that three-phase is better. It is not better or worse; it is a different output arrangement, and an unbalanced single-phase load on a three-phase set wastes capacity.
The starting question that decides the size
Ask what starts, and how. A motor started direct on line draws a large surge for a short period. A star-delta or soft starter reduces that surge at the cost of starting torque. A variable speed drive removes most of the surge but adds electronics that the set has to tolerate.
For a 15kVA set the practical rule is that the largest motor should be checked against the set's capability during the start, with the rest of the load either off or small. Where that is not possible, the options are a larger set, a gentler starting method, or a sequenced start where the motor is brought on before other loads.
This is also where a supplier's answer tells you something. A supplier who asks for the largest motor and its starting method is sizing. A supplier who quotes from the kVA figure alone is filling in a form.
How to size properly in one pass
Build the load list from the rating plates, not from memory. Include everything that can run at the same time, and note separately the largest motor and how it starts. Then apply the power factor conversion so the comparison is in kW, and check the result against the set's continuous capability rather than its peak label.
The generator sizing guide walks through the same sequence in more detail, and the kW, kVA and kWh page explains the unit conversion so the arithmetic is not a guess. Where the site sits in a band rather than at a single rating, the 10 to 30kVA band page shows how the options compare.
If the load list keeps changing, the honest answer is that the site is not ready to be sized. A quotation built on a load list that is still moving will be replaced by another quotation, and the set chosen from it will be replaced by another set.
What to send for a quotation you can compare
A quotation is only comparable if it describes the same machine and the same scope. The list below is what an enquiry needs in order to produce one.
Send it in writing, and ask for the reply in writing. A verbal figure cannot be compared with a written one, and it cannot be checked later when the specification changes.
| Item to send | Why it changes the offer |
|---|---|
| Load list with running totals | Determines whether the rating is adequate at all. |
| Largest motor, rating and starting method | Decides the surge the set must survive. |
| Phase, voltage and frequency | Decides the alternator configuration. |
| Silent or open preference, and where it will sit | Decides the enclosure and the site works. |
| Whether a changeover is needed | The changeover may or may not be in the offer. |
| Delivery term you want quoted | Two terms describe different points in the journey. |
Questions buyers ask about this size
The answers below are the ones that come up most often at this rating. Where the answer depends on the site, the question to ask is stated rather than a figure that would not hold.
Send the load list and the largest motor
Tell us what runs at the same time, the largest motor and how it starts, the phase and voltage, and where the set will sit. We will confirm whether 15kVA is the right size before quoting, and say so if it is not.
Get a written quotation
Three fields. We reply with the rating, the engine option and the delivery basis.
Frequently asked questions
How many kW is a 15kVA generator?
At a power factor of 0.8 a 15kVA set delivers 12kW of usable output. The figure moves with the power factor of the load, which is why the offer should state the basis it uses.
Can a 15kVA generator run a whole house?
It can run a house with a modest load, but not a house where several air conditioners, a pump and a kitchen run together. The decision is made by what runs at the same time, not by what is installed.
Will a 15kVA set start a borehole pump?
Only if the pump's starting surge fits within what the set can supply. Ask for the pump's rating and starting method, and check the start with the rest of the load either off or small.
Is three phase better than single phase at this size?
Neither is better in itself. The phase follows the load: a site with three-phase equipment needs a three-phase set, and a site with only single-phase loads does not gain from one.
What does silent mean at this rating?
It means the set is supplied in an attenuated canopy that reduces the noise reaching the surroundings. It does not make the set inaudible, and it does not remove vibration transmitted through the floor.
How much space does a 15kVA set need?
Enough for the set, for air to enter and leave the canopy, and for someone to reach the service points. The canopy's air path is the part most often squeezed, and it is the part that decides whether the set runs cool.
Can I add a second set later instead of buying a larger one?
Adding a second set is a different arrangement rather than an extension: the two have to be able to share load, which means controls and switchgear. Where growth is likely, sizing for it at the start is usually simpler than paralleling later.