An 800kVA set is normally the base-load machine on a plant, running with a steady floor and riding the peaks on top of it. Specifying it well starts with separating those two numbers, because they drive different parts of the offer.
Base load and peak load are two different numbers
The base load is what runs whenever the plant runs: extraction, ventilation, lighting, pumps, control systems and the steady share of the process. The peak is what happens when the heavy drives come on.
The base load decides fuel planning, cooling and the duty assumption. The peak decides the alternator frame and the starting arrangement. Merging them into one figure hides both.
Write them separately in the request. A supplier who receives two numbers can size the set honestly; a supplier who receives one can only guess which of the two they were given.
Scope items that matter at this rating
The auxiliary scope carries most of the variation between two offers at this size.
| Scope item | What to confirm |
|---|---|
| Rating basis | Prime and standby separated, with the daily hours the rating assumes. |
| Cooling and ventilation | Radiator and air path sized for the site ambient, not a reference condition. |
| Protection and control | Breaker, controller functions, shutdowns, alarms and remote start. |
| Enclosure strategy | Open, silent or container, each with different access and cooling consequences. |
| Fuel and runtime | Storage volume, transfer arrangement and the refuelling plan for the duty. |
| Synchronising boundary | Whether load sharing and synchronising equipment sits in the set scope or in separate switchgear. |
| Shipping plan | Dimensions, weight, centre of gravity, lifting points and destination handling. |
Choosing the enclosure strategy on a real site
A plant building with designed ventilation can take an open set, and open installation is easier to maintain. An outdoor position near occupied areas suits a sound-attenuated canopy, which adds weight and cost.
A container arrangement suits remote sites, harsh environments and projects where the power plant may be relocated. It simplifies shipping and handling, but the internal layout still has to keep filters, belts, hoses and panels reachable and must not compromise the cooling air path.
Whichever is chosen, the ventilation design belongs with the set supplier rather than with a separate contractor, because the set's usable output depends on it.
Single set or two sets sharing the load
Where the plant needs to keep running with one unit out of service, two smaller parallel sets are usually the more honest answer than one large set. They also allow a low-demand period to run on one unit.
That choice changes the controller, the switchgear and the protection philosophy, and it must be made at specification stage rather than added later. If it is even a possibility, mention it when requesting the offer.
What to fix in writing before the order
Agree the engine and alternator identification, the cooling package for the site, the protection and control scope, the enclosure, the fuel arrangement, and the test and inspection evidence together with the shipping plan.
Related: 700kVA diesel generator, 1000kVA generator guide, 500-2000kVA range, data centre power guide.
800kVA questions
Why separate the base load from the peak load?
Because they drive different decisions. The base load sets fuel planning, cooling and duty assumptions, while the peak sets the alternator frame and the starting arrangement. A single merged figure conceals both.
Should the enclosure be open, silent or container type?
An open set suits a properly ventilated plant building, a silent canopy suits outdoor or noise-sensitive positions, and a container suits remote or harsh sites. Each carries different weight, access and cooling consequences.
What shipping details matter at this size?
Dimensions, gross weight, centre of gravity, lifting points, packing arrangement and the destination handling method. These need to be settled before production, and a plan that works in the factory yard may not work at the site entrance.