A five kVA difference at this size is smaller than the tolerance between one supplier's rating basis and another's. Treat it as a labelling question until the continuous rating says otherwise.
Why 165kVA appears at all
Generator ratings are not a single universal ladder. Manufacturers publish a rating in kVA, in kW, or in both, and the number that ends up on a nameplate depends on which basis the factory used and which market the unit was built for.
Where a factory rates a set in kW, the kVA figure is derived by dividing by a power factor. Where it rates in kVA, the kW figure is derived by multiplying. In both directions the arithmetic produces round numbers on one side and less round numbers on the other, which is why some ratings appear in steps of five and others in steps of ten.
That is the origin of 165kVA. It is not a separate product line invented between 160 and 200. It is a rating that appears when a set is described on a basis that produces that figure.
160 and 165: the honest comparison
At a power factor of 0.8, a 165kVA rating corresponds to 132kW, and a 160kVA rating corresponds to 128kW. The gap is four kilowatts of real output.
Four kilowatts is not nothing, but it is smaller than the variation that comes from other decisions: whether the rating is prime or standby, what ambient temperature the rating assumes, and which engine model is actually fitted. A 160kVA set rated conservatively can outperform a 165kVA set rated optimistically, and the reverse is equally possible.
So the honest answer is that they are usually the same class of machine under two labels. Treating them as different product lines leads to two mistakes: paying a premium for five kVA that does not exist in the hardware, or rejecting a 160kVA offer because the specification asked for 165 without establishing why.
| Basis | 160kVA | 165kVA |
|---|---|---|
| Output at 0.8 power factor | 128kW | 132kW |
| Difference in real output | Four kilowatts | Four kilowatts |
| Typical relationship | Same machine class, different rating convention | Same machine class, different rating convention |
| What actually differs | The continuous rating and the engine fitted | The continuous rating and the engine fitted |
| What usually does not differ | The enclosure, the alternator frame, the application | The enclosure, the alternator frame, the application |
When the difference matters, and when it does not
The difference matters when the load sits between the two figures. A site whose calculated requirement falls between 128kW and 132kW is genuinely on the boundary, and there the extra four kilowatts decide whether the set is inside its rating or at the edge of it.
It also matters when the rating basis differs. A 165kVA standby rating and a 160kVA prime rating are not the same promise, even though the numbers are close. Prime and standby describe different continuous capabilities, and a buyer comparing them on the kVA figure alone is comparing the wrong number.
It does not matter when the load is comfortably inside either rating. A site that needs a little over a hundred kilowatts is not served better by arguing about five kVA; it is served better by confirming the continuous rating and the engine.
It does not matter when the constraint is physical. If the plant room, the foundation or the changeover was designed around a particular frame size, the label is secondary to whether the unit fits.
What a set at this size is asked to carry
This band sits above small commercial backup and below the larger industrial plants. In practice it serves mid-sized facilities: a hotel with a substantial load, a hospital block, a manufacturing unit with a defined process load, a commercial building with lifts and chillers, or a site with a large pump set.
The characteristic of this band is that the load is no longer a collection of small appliances. There is usually at least one significant motor, and its starting method decides more about the sizing than the running total does.
That is why the useful question at this rating is not which of 160 or 165 to choose, but what the largest motor is and how it starts. The sizing calculator turns those two inputs into a capacity range, and the sizing guide sets out the method behind it.
| Site type | What the set is doing | What decides the fit |
|---|---|---|
| Hotel with substantial load | Whole-building backup, including kitchen and chillers | The chiller starting arrangement and the peak hour |
| Hospital block | Critical loads with limited tolerance for interruption | Changeover arrangement and the load that must never drop |
| Manufacturing unit | Process load with motors starting through the shift | The largest motor and how often it starts |
| Commercial building | Lifts, chillers, common areas | Lift starting current and whether the chillers are inverter driven |
| Water or irrigation site | Large pump set as the dominant load | Pump starting method and the depth being lifted from |
Where this rating stops
It stops where the largest motor's starting surge, plus the load already running, exceeds what the set can supply. At this size that usually means a single large motor, not a collection of small ones.
It also stops where the site expects to grow. A set at the top of its rating has no room for the next chiller or the next production line, and the exchange costs more than the next rating up would have.
And it stops where the load is genuinely industrial. A site with several large motors starting independently is a site where the answer is usually a larger single set or a different arrangement, not a marginal increase in kVA.
What changes at installation, whatever the label says
At this rating the machine is heavy enough that the installation stops being a delivery and becomes a piece of construction. That has a practical consequence for the 160 versus 165 question: if the foundation, the access route and the plant room were designed around one frame size, a marginally different unit may not fit the position even though the kVA figures are close.
The foundation has to carry the set loaded with fuel, and it has to do so without transmitting vibration into the building. The plant room has to let air in and out at the rate the radiator demands, which at this size is a substantial opening rather than a louvre. The exhaust has to be routed to a discharge point that does not sit under a window or beside an air intake.
Cabling is the line most often underestimated. The distance from the set to the changeover point decides the cable size and the route, and both are decided by the building rather than by the generator. Where the run passes through occupied or finished areas, the cost of the route can exceed the cost of the cable.
None of this is affected by five kVA. It is affected by the physical size of the unit and by where it has to go, which is why the site drawing and the access route belong in the enquiry alongside the load list. The installation scope page lists the works that a supply quotation usually leaves out.
What to specify so the offer is checkable
The rating is the least useful line on a quotation at this size, because it is the line most easily written without commitment. The useful lines are the ones that describe the machine behind it.
Ask for the continuous rating and its basis, the engine model and rating, the alternator make and frame, and the enclosure. Then ask whether the figures quoted are for the same duty the site needs.
| Ask for | Why it settles the 160 versus 165 question |
|---|---|
| Continuous rating and duty basis | A prime rating and a standby rating are different promises. |
| Engine model and rating | The engine, not the label, decides what the set can sustain. |
| Alternator make and frame | Confirms the electrical end matches the quoted rating. |
| Ambient conditions assumed | A rating at one temperature is not the same at another. |
| Enclosure and installation scope | Decides whether the unit fits the position. |
| Whether the rating is guaranteed in writing | A figure in a quotation should be a commitment. |
Ask for the continuous rating, not just the label
Send the load, the largest motor and how it starts, and ask for the continuous rating with its duty basis, the engine model and the alternator identification. We will confirm whether 160 or 165 is the honest description of what you need.
Get a written quotation
Three fields. We reply with the rating, the engine option and the delivery basis.
Frequently asked questions
Is 165kVA the same as 160kVA?
Usually they are the same class of machine under two rating conventions. At a power factor of 0.8 the difference is four kilowatts of output, which is smaller than the variation introduced by duty basis and ambient assumptions.
Why would a supplier quote 165kVA instead of 160kVA?
Because the factory rated the set on a basis that produces that figure, often from a kW rating. It does not by itself indicate a larger machine.
Which one should I buy?
Buy on the continuous rating and the engine fitted, not on the label. If the load falls between the two figures, the duty basis decides more than the five kVA does.
Does 165kVA mean 165kW?
No. At a power factor of 0.8 it corresponds to 132kW. The two units measure different things, and the quotation should state which one it is describing.
Is a 165kVA set enough for a hotel?
It can be, depending on the load and how the chillers start. The peak hour and the largest motor decide the answer, not the building type.
Should I step up to 200kVA instead?
If the load is close to the top of this band, or growth is expected, the next rating gives margin that five kVA does not. The sizing calculator shows where the boundary falls for a given load.
What single question settles it?
Ask for the continuous rating in writing, with the duty basis and the ambient assumption. That answer is comparable; the kVA label on its own is not.