WhatsApp: +86 157 0593 2345Email: miu@taiyudapu.comCall the factory: +86 157 0593 2345
Buying wholesale

Wholesale Generator Supply from a Chinese Factory: What Nigerian Dealers Need

Rating, quantity, payment, clearing. Four decisions set your landed cost long before the unit price matters, and three of them sit outside the quote.

Short answer. If you are a Nigerian dealer, installer or project buyer who wants to buy generators wholesale rather than one unit at retail markup, the decision comes down to four things and nothing else: the rating you can actually resell, the quantity that makes freight sane, the payment structure that protects you, and who clears the shipment. This page puts those four in order and links to the detailed guide for each.

Who this supply model suits

  • Dealers and shop owners restocking 30 to 150 kVA sets, where local demand is deepest and container space is used efficiently.
  • Installers and electrical contractors who need consistent ratings for repeat jobs and want the same make each time, not whatever is on the floor that week.
  • Project buyers supplying a site, an estate or a facility where the rating and the documentation have to be right the first time.
  • New importers testing the market with four to eight sets before committing to a container program.

It does not suit a buyer who needs one set this week. Local stock wins that purchase, and pretending otherwise wastes everybodys time. The wholesale route wins when you can plan six to ten weeks ahead and when the quantity justifies the paperwork.

The four decisions, in order

The four decisions that set your landed cost
DecisionWhat it controlsWhere the detail is
Rating and duty classWhether the set survives continuous load, and what you can honestly resellPrime or standby rating, engine and alternator tier
Quantity and containerFreight, handling and documentation cost per unitMOQ and tier pricing guide
Payment structureYour exposure between deposit and deliveryPayment terms and release points
Shipping and clearingWho owns the goods at each stage, and what lands on your deskLCL or full container, plus conformity documents

Buyers routinely start with price and work backwards. That order produces a unit price that looks good and a landed cost that does not, because three of the four decisions above sit outside the unit price. Start with the rating, because everything else is sized around it.

What the rating actually means

The same frame is frequently sold at two ratings, and the difference decides whether the set runs a workshop for eight hours a day or stands by for the day the grid fails. A standby rating assumes limited hours at variable load; a prime rating assumes continuous duty at a declared average. If you resell a standby set to a buyer who runs it continuously, the failure lands on you, not on the factory.

  • Ask for the rating in writing on the order, not only in the brochure.
  • Ask which rating the load test was performed at, and for how long.
  • Ask what derating applies at the ambient temperature of your buyers site, since a set rated at a temperate ambient loses output in a hot plant room or under a canopy in the sun.

Where the price actually comes from

Rather than quote a single figure, we publish bands by rating so a dealer can plan before sending an enquiry. The bands are built from public FOB listings for each rating class and reviewed periodically; they are a planning reference, not a quotation, because engine tier, enclosure, duty rating, ATS and control panel move the number inside the band.

Start from the rating-by-rating price bands, then narrow to the exact size you intend to stock, for example the 100 kVA page or the 250 kVA page.

Quantity: the decision dealers get wrong

A single set is a purchase; four to eight sets is a shipment. The difference is not the discount, it is that freight, documentation and clearing are fixed costs spread across whatever you load. Our MOQ and tier pricing guide sets out where the crossover sits and why a buyer who needs one set should still ask for a container rate for four.

Payment and shipping, in plain terms

Chinese factories quote in US dollars and almost always ask for a deposit followed by a balance. The percentage matters less than what each payment is tied to, which the payment terms guide covers milestone by milestone, including the inspection habits that make a pre-shipment balance safe.

On the shipping side, a small dealer can start with LCL and move to a full container when volume justifies it; the LCL guide explains the crossover and the destination charges that surprise first-time importers. If your volume already fills a box, the container loading guide shows how a mixed load is planned.

A first order, in sequence

  • Fix the rating and the engine tier you intend to resell, and write both into the order.
  • Ask for a container loading plan at your intended quantity, so the quantity is set by cube rather than by budget.
  • Confirm the conformity documents and who arranges them; a shipment without the right paperwork does not clear.
  • Agree the payment milestones and commission an inspection before the balance is released.
  • Book freight with a destination cost estimate from your own clearing agent, not only from the forwarder selling you space.
  • Put a first-order spares kit in the same container: filters, belts, a water pump and one control module per rating family.

Dealers comparing the direct route with local wholesale should read how the dealer and stockist route compares with importing, and what a distributor arrangement changes about price and support. If you buy out of the Lagos clusters, the wholesale market comparison breaks down what you are actually paying for there.

What the first container should contain

The cheapest first container is almost never the one with the largest number of sets in it. It is the one that answers the demand you can actually see, leaves room for spares, and does not strand your working capital in a rating nobody in your area asks for. A workable pattern for a first order is a majority of one or two proven ratings, a minority test quantity of a third, and a spares allowance sized to the number of sets rather than to the budget left over.

  • Two thirds of the load in the ratings you can already resell, so the container pays for itself.
  • One test rating in small quantity, chosen because a specific buyer asked, not because it looked popular online.
  • Spares and a control module per rating family, which cost little in cube and a great deal to air-freight later.
  • Deliberate empty space at the door end if the load plan allows it; a container stuffed to the roof is harder to unload and easier to damage.

Where first-time importers get stuck

The delays we see are rarely mechanical. They are documentary and financial: a deposit sent before the rating was confirmed in writing, an inspection skipped because the production week slipped, a consignee name that does not match what the clearing agent filed, or a balance released against a photograph rather than a load test. Each of those costs days, and days at the port cost money.

  • Confirm the rating and the engine tier in the order document, then treat chat messages as conversation rather than contract.
  • Book the inspection when production is scheduled, not when the set is finished, so a slip does not compress the inspection into a single day.
  • Send your clearing agent the draft documents before the vessel sails, which is the only moment a correction is still free.

Frequently asked questions

Do you supply dealers rather than end users?

Yes. The supply model is built around buyers who resell or install: consistent ratings, container planning, documented conformity and spares support, rather than single-unit retail service.

What is the smallest order you would quote?

There is no fixed minimum, but the economics change with volume. A single set can ship LCL; four to eight mid-size sets is where freight and clearing stop dominating the landed cost.

Are prices in dollars or naira?

Quotations are in US dollars, as is normal for purchases from a Chinese factory. Naira calculations depend on your own exchange rate and should be run by you before committing.

Can I mix ratings in my first order?

Yes, and it is a sensible way to test which rating sells in your area. Each rating needs its own packing list line and serial numbers, and heavier sets have to be positioned so the load is spread along the container floor.

Who handles SONCAP and clearing?

That has to be agreed explicitly, because it decides who pays and who carries the delay risk. Confirm in writing which side arranges conformity documents and that your clearing agent can work with the documents provided.

Do you support warranty in Nigeria?

Warranty terms and who performs the work have to be written into the order rather than assumed. Ask for the parts route and the response expectation before you commit, since a warranty that requires returning a set to China is not usable for a dealer.

Get a written quotation

Three fields. We reply with the rating, the engine option and the delivery basis.

Send on WhatsApp