WhatsApp: +86 157 0593 2345 Email: miu@taiyudapu.comCall the factory: +86 157 0593 2345

80 kVA diesel generator price range in Nigeria

Indicative FOB China range for a standard 80 kVA set, reviewed November 2026. This is a market reference, not a quotation: the final number depends on engine tier, enclosure, duty rating, ATS, control panel and delivery term.

Indicative FOB China price band, 80 kVA diesel generator
RatingIndicative FOB China range (USD)
80 kVA standard setUSD 3,900–6,100
Same rating, Cummins or Perkins poweredTypically upper half to above the band

Range built from public China FOB listings for this rating class and reviewed on 13 November 2026. Container freight, Nigerian duty and inland delivery are additional and depend on your port and site.

Landed cost in Nigeria — duty, levies, VAT and the naira figure — is worked out line by line in our landed cost calculator.

Nigeria generator buyer guide

80kVA Diesel Generator: Nigeria Quote Guide

Eighty kVA is the point where a site usually has more than one building or more than one process competing for the same set. That changes the question from 'what size' to 'which loads can be kept apart', and the second question is where a quotation earns its value.

Wrapped open generator sets and packed components inside a workshop
Visible workshop reference: a grey and teal silent enclosure with service doors open. Suitability, rating and destination depend on the load schedule and the written quotation.
Framing

Eighty kVA is approximately 64kW at a 0.8 power factor. At this size the running load is rarely the limiting factor; the combination of heavy starts is.

When a site has more than one load centre

An 80kVA set commonly serves an estate block with a borehole, a clinic with laundry, or a small production unit with an office attached. Each of those has its own pattern of demand, and they overlap in ways the owner knows and the supplier does not.

Write down which load centres exist, and roughly when each is busy. That description is more valuable at this size than a precise total, because it tells the supplier where a sequencing rule can replace a larger set.

Where overlap cannot be avoided, say so. The correct response to unavoidable overlap is a larger rating, not an undersized set and a maintenance contract.

Specification lines that carry real weight here

At 80kVA the auxiliary items start to matter as much as the engine.

Items that move an 80kVA quotation, and why each one matters
ItemWhy it changes the offer
Rating basisPrime and standby ratings support different daily hours.
Engine optionCost, fuel burn and parts availability differ between options.
AlternatorFrame and excitation affect motor-starting performance directly.
ControllerAuto start, protection and monitoring functions are not standard across offers.
EnclosureAttenuated canopies add cost, weight and ventilation requirements.
Cooling and fuelRadiator sizing for local ambient, plus base or separate tank.
DeliveryPacking standard and FOB or CIF responsibilities must be explicit.

Deciding between 80kVA and the next step

If the load list sits close to the 80kVA envelope, compare against the next band before ordering. The difference in cost between a comfortable set and a marginal one is far smaller than the cost of a second set, or of a year of nuisance trips.

Send the schedule and the largest motor, and ask for both sizes on one specification. That comparison is free and it removes the most common cause of regret at this rating.

Related: 60kVA generator guide, 100kVA generator guide, ATS panel guide.

Get a written quotation

Three fields. We reply with the rating, the engine option and the delivery basis.

Send on WhatsApp

WhatsApp RFQ template

Hello, I need an 80kVA diesel generator quote for Nigeria. Buildings or processes served: [ ], load list: [ ], largest motor and start method: [ ], voltage and phase: [ ], open or silent: [ ], ATS: [yes/no], delivery: [CIF Lagos/FOB China].

Send this RFQ on WhatsApp

64kW, and the three ways sites overspend it

At a power factor of 0.8 the rating converts to 64kW. Three habits consistently turn that figure into a disappointment, and none of them is about the machine.

The first is adding nameplates without asking when they run. A list of connected loads is not a demand, because a site never draws everything at once, and a quotation built on the sum of the plates buys capacity that will never be used while leaving the real peak unexamined. The second is ignoring the largest start: the rating has to cover the biggest motor accelerating while the rest of the site is already on, and that moment is frequently the only one that matters. The third is treating the conversion as a target rather than a limit, then adding loads until the set sits at its ceiling every afternoon.

The correction is unglamorous. Build a short schedule of what runs together, mark the largest motor, and compare that worst case with the conversion. Most sites find the honest requirement is close to where they started, and the money is better spent on the alternator, the controller or a proper plant room than on another step of rating.

Where the reserve in this rating is actually used

The table sets out the load types that most often appear on a site of this size, and what each one does to the margin. It is a planning view, not a substitute for a schedule with real figures.

Load types at 80kVA, and how each one uses the margin between running load and the rating
Load typeEffect on the margin
Lighting and general socketsSteady and predictable. Consumes margin slowly and rarely causes a problem.
Air conditioning, several unitsEach start is a surge. Staggered starts are comfortable; simultaneous restart is not.
Water pumpingUsually the single largest start on the site, and the one that decides the rating.
Cold room or refrigeration bankRuns continuously at a moderate load, then adds compressor starts on top.
Workshop machinesShort, heavy and irregular. Fine individually, difficult when two start together.
ICT, POS and security systemsSmall in power but sensitive to voltage dip and to frequency wandering.

Two boards on one set: the split that decides the rating

Sites of this size often have more than one distribution point, and how the load is divided between them changes what the set experiences. A single board concentrates everything, so the set sees one large step when the board is energised. Two boards allow a sequence: essential loads first, then the rest, which spreads the step and keeps the voltage steadier for the equipment that cares.

The split also decides what happens during an outage. If the essential board carries lighting, refrigeration and the pump, and the other carries air conditioning and workshop machines, a changeover can restore the essentials immediately and bring the heavy loads back once the set has settled. That arrangement is worth more than an extra step of rating, because it removes the simultaneous restart that would otherwise be the design case.

Phase balance belongs in the same conversation. Distributing single-phase loads evenly across the three phases keeps the voltage on each phase close to the others, and unbalanced distribution is a common reason a set that is nominally adequate behaves badly in practice.

Canopy or open frame when the set sits near people

The enclosure question at this size is mostly a question about distance. An open set needs a room with inlet and outlet air, a exhaust path that does not discharge into a window, and enough clearance for a fitter to reach the filters and the tap on the sump. A canopy set packages those requirements, at the cost of a heavier unit, a hotter interior and routine checks that begin with unlocking a door.

Where the set stands within earshot of patients, guests, students or a residential boundary, the canopy is the practical answer and the ventilation design matters more than the acoustic lining. A canopy with an undersized air path will run hot, derate itself and shorten the life of everything inside it, which is a worse outcome than a slightly noisier open installation that breathes properly.

Where the set has a yard, a store and someone who looks at it daily, an open set in a prepared room is easier to maintain and easier to diagnose, because the whole machine is visible at once.

Why two offers at this rating diverge so far

Two quotations carrying the same number can differ in almost every component behind it. The engine is the first variable: the design, the plant that assembled it, and whether spare parts are available locally or have to be imported on request. The alternator is the second, and at this size the difference between a lightly built unit and one rated for continuous duty is the difference between a set that holds its rating and one that must be watched.

The control and protection package is the third. A panel with a simple start circuit and a panel that monitors oil pressure, temperature, speed and current, and trips before damage rather than after, are not the same product. The enclosure is the fourth: open, canopy or container, with the air path and the acoustic treatment designed for the site or inherited from a catalogue.

The fifth is what comes in the crate beyond the machine, from filter sets and belts to a manual in a language the operator reads. The sixth is the commercial scope: where the seller's responsibility stops, which port or which site, and who carries the risk in between. Those six lines are the substance of a quotation, and they are the reason a single advertised figure cannot be compared with anything.

Dust, heat and fuel storage on a northern site

Siting changes the maintenance story more than the rating does. In the dust season the air cleaner loads far faster than the service interval assumes, and a set that is checked on a calendar rather than on condition will run restricted long before anyone notices. A restriction gauge, or a habit of inspecting the element at every refuel, is worth more than a larger filter.

Heat is the second factor. A set in a room with a small inlet will pull its own hot air back through the radiator, and the result is a slow derate that looks like a fuel problem. The third is fuel storage: a tank that is kept full breathes less moist air, and water arriving with the fuel does more damage at this size than at any other, because the injection equipment is precise and the filters are small.

None of these is a reason to change the rating. They are reasons to specify the installation, and they belong in the same conversation as the quotation rather than in the week after delivery.

80kVA generator questions

What is 80kVA in kW?

Approximately 64kW at a 0.8 power factor. The conversion describes the set, while the site requirement follows the connected load and the largest start.

Is 80kVA enough for a clinic or an estate block?

It can serve essential loads across both, such as lighting, refrigeration, pumps, office equipment and limited air conditioning, provided the heavy motors are not started simultaneously. Anything with imaging, sterilisation or cold storage should be scheduled properly first.

Why ask for two sizes on one specification?

Because it isolates the true difference between bands. Comparing an 80kVA offer from one supplier against a 100kVA offer from another mixes size, specification and delivery into one number and tells you nothing.